Laserfiche WebLink
F. In-Tank Gauging/ SYR Equipment: ❑ Check this box if t:ink waukin=is used only for inventory control. <br /> � � � � r} <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ■ Yes Q No* Has all input wiring been inspected for proper entre and termination, including testing for ground faults:' <br /> ■ Yes ❑ No* Were all tank -gau�King probes visually inspected for damage and residue buildup'? <br /> ■ Yes ❑ NO Was accuraq of s)stem product level reading_s tested" <br /> ■ Yes ❑ No* Was accuracy of sx stem water level readings tested? <br /> ■ Yes Cl Noy` Were,€11 probes reinstalled properly`? <br /> ■ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed:' <br /> 4 In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ■ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification. was a leak simulated to verif. LLD perfornrince'' <br /> ❑ NIA (Check all that aE)p]ry Simulated leak rate: ❑ ; T.p.h.: ❑ t).1 g.p.h : ❑ 0.2 p,p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulator} requirements') <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated'.' <br /> ❑ Yes ❑ No* For mechanical LLDs. does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs. does the turbine automatically shut off if the LLD detects a leak`? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs. does the turbine automatically shut off if an`-portion of the monitoring system is disabled <br /> ❑ N/A or disconnected'.' <br /> ❑ Yes ❑ No* For electronic LLDs. does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test:' <br /> ❑ Yes ❑ No* For electronic LLDs_ have all accessible wiring connections been visuall% inspected:' <br /> ❑ NIA <br /> ❑ Yes 1 ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed" <br /> In the Section H. below, describe how and when these deficiencies were be corrected. <br /> H. Comments: <br /> Page 3 of 3 03,01 <br />