Laserfiche WebLink
SWRCB January,2002 Page of <br /> 0 <br /> 5. SECONDARY PIPE TESTIN(V <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑ Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Rung Piping Run# Piping Run # Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 Min <br /> starting test: <br /> Test Start Time: 9:00 <br /> Initial Reading(R[): _0 PSI <br /> Test End Time: 10:00 <br /> Final Reading(RF): 0 PSI <br /> Test Duration: 60 Min <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or FAILED <br /> Criteria: <br /> Test Result: ❑Pass ;®Fall' ❑;Pass ❑Fall [J'Pass ❑Fail ❑Pass [].Fall <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> The pressure annular failed -1-think that it's le_akincl from the other and of the <br /> nininn_ <br />