My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2001 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 7:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2009
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2001 - 2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dry fitting secondary Containing short runs <br /> containment systems <br /> (cont.) For primary runs under four feet in length,astandard 14-inch containment coupling <br /> and shortp•P I e nipples can be substituted for 31b-inch containment piping. <br /> PP anmentp•n p 9 <br /> ^` L¢4k <br /> III � 14 <br /> Fig. 7-10.Contain short runs with a — <br /> standard containment coupling and — <br /> short containmenti e nipples. <br /> A P AA <br /> Containing crossovers and very short runs <br /> Make crossovers by using 45°elbows and tees in both primary and containment.In <br /> this+Wray a minimum 4-inch vertical clearance can be provided between the lines.Limit <br /> the length of containment <br /> Containment _ ` nipples at crossovers and <br /> 4s°elbow D+1'r2 other very short runs to the <br /> face-to-face distance <br /> �• y between the secondary <br /> Fig. 7-i 1. Atcrossovers and very short - ` fittings plus Vh inches in <br /> runs where even a containment half- ® order to allow sufficient <br /> coupling cannot be included,cut the space to move the <br /> containment pipe so that a minimum 4 <br /> 3/inch insertion depth in the min containment nipple while <br /> containment fittings is maintained. T - -0- working on the primary. <br /> ��, This length will provide an • <br /> l insertion depth of inch of <br /> Containment tee pipe in the containment <br /> - fittings. <br /> Centralizers <br /> Centralizers are not required in Dualoy 3000/1-containment systems unless in-pipe <br /> detection lines have been specified by the owner.In such cases,contact Ameron for <br /> availability. <br /> Take care not to allow stones and backfill to enter the annular space between primary <br /> and containment as this may result in leaks. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.