My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACAMPO
>
4579
>
2300 - Underground Storage Tank Program
>
PR0231504
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 3:20:18 PM
Creation date
11/2/2018 7:52:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231504
PE
2381
FACILITY_ID
FA0003573
FACILITY_NAME
A & M MARKET*
STREET_NUMBER
4579
Direction
E
STREET_NAME
ACAMPO
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01703053
CURRENT_STATUS
02
SITE_LOCATION
4579 E ACAMPO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ACAMPO\4579\PR0231504\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
11/22/2011 8:00:00 AM
QuestysRecordID
98683
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERFORMED BY SACRAMENTO EQUIPMENT MAINTENANCE COMPANY, INC. <br /> 2533 CONNIE DRIVE - SACRAMENTO - CALIFORNIA - 95815 <br /> PHONE 916-925-2716 <br /> WORK ORDER It _ 622o5 DATE <br /> SITE NUMBERt PRODUCT <br /> SITE NAMEt ASM Market STP BRAND <br /> SITE ADDRESSt _ 4579 F. A amen <br /> AcamQo,Pa . <br /> E !,'T-L_EAK,,,,DETECTORK TEST <br /> PRODUCTe P.E6ULAP,, UNLERDPP.E)tI -UNLERDED, DIESEL (CIRCLE ONE) <br /> NOTEt USE SEPARATE FORM FOR EACH 7ANY, <br /> 1 ) RUNNING PRESSURE ` <br /> 2) SHUT-OFF PRESSURE <br /> 3) AMOUNT OF PRODUCT RELEASED THRU BIBCOCt, TO ZERO, /If OZ, <br /> S) WITH VALVE OPEN, START STP, LIS PRESSURE �_ PSI . <br /> 5) REDUCE FLOW TO RATE OF 7 OZ. PER )1It UTE} <br /> LIST PRESSURE AT THIS FLOW RATE 7 PSI. <br /> 6) TURN STP OFF. LET PRESSURE DROP TO ZERO THRU LEAK JUST <br /> CREATED. LIST TIME FOR GAUGE TO REACH ZERO. ,_ MIN, 2,��)SEC. <br /> 7) TURN THE STP BACK, ON. KEEP LEAP, RATE AT BIBCOCK.�� <br /> LIST PRESSURE _,7_ '-141 PSI. FLOW RATE AT NOZZLE GPM. <br /> 8) STOP LEAK, WITH STP STILL ON. <br /> DOES LEAK DETECTOR RESET? YES NO <br /> IF YES, HOW LONG TO RESET? M/IN. _2, SEC. <br /> 9) TURN STOP OFF. LIST PRESSURE Z 7 PSI. <br /> 10) TURN STP BACK, ON. <br /> LIST TIME TO REACH PRESSURE RISE. MIN. Z SEC. <br /> 11) LIST PRESSURE 2_7'_ PSI. <br /> 12) OPEN NOZZLE AND LIST PRESSURE - PSI. <br /> 13) SATISFACTORY LEAK DETECTOR !!E�YYES N0. <br /> THIS TEST IS FOR LEAK. DETECTOR SERIAL q _ Q11) /)art - ;tcl7B <br /> LEAK DETECTOR <br /> (OLD) MODEL DATE CODE & SERIAL NUMBER <br /> (NEW) MODEL DATE CODE & SERIAL NUMBER <br />
The URL can be used to link to this page
Your browser does not support the video tag.