My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2022 1:01:27 PM
Creation date
11/2/2018 7:59:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\BILLING 2008-2015.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORItWVF <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(page I of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN l5 2.CHANGE OF INFORMATION <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 4WI <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEMS) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) < ILL G s <br /> BUSINESS SITE ADDRESS I )•) a� 1Qu CITY 1N. <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)most be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,2634,2638,2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 4 h <br /> HI. ONTTORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. [9 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2672, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAUN[MNT 49 3 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 4906 <br /> PANEL MANUFACTURER: moi.en-OA, s.^' 49o-9. MODEL#: ( - G 4903 <br /> LEAK SENSOR MANUFACTURER: I T c 4969. MODEL#(S): z-L 49610 <br /> -CF2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(31.(23 CCR§2643) 49 11 <br /> PANEL MANUFACTURER: 090'12 MODEL#: 49613 <br /> IN-TANK PROBE MANUFACTURER: 4WR MODEL#(S): 49613 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY 490716 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 49 17 <br /> PROGRAMMED TESTS: ❑ c 0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): �9 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49626 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a 36 HOURS ❑ b.60 HOURS 44W2211 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49 D <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 49 N <br /> 490.29 <br /> ❑ <br /> 99.OTHER (Specify): 490.E <br /> 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> .CONTINU <br /> OUS UOUSMONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49628 <br /> ISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: .DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 49069 <br /> PANEL MANUFACTURER c a90'so MODEL#: '-' 1 4Wn <br /> LEAK SENSOR MANUFACTURER: ( ( d90.22 MODEL#(S): 49633 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. P;a YES ❑b.NO 49 M <br /> FAILUREIDISCONNECITON OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a YES ❑b.NO a9o-ss <br /> 2.MECHANICAL LINE LEAK DETECTOR(MILD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TES AND RESTRICTS OR SHUTE OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 4WM i <br /> MLLD MANUFACTURER(S): �, 1 <br /> `37 MODEL#(S): .S'1 4 -.t <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT RO LY PERFORMS 3.0 g.ph.LEAK TESTS (23 CCA§ 49639 <br /> ELLD MANUFACTURER(S) 49040' 1 MODEL#(S): 490'41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490'93 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC POMP SHUTDOWN. ❑a YES ❑b.NO 49040 <br /> 4.PIPE INTEGRITY TESTING 49043 <br /> TEST FREQUENCY El a ANNUALLY b.EVERY 3 YEARS c.OTHERS i 49a46490.4f <br /> 5.VISUAL PIPE MONITORING. 490.16 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY A EACH TIME SYSTEM OPERATED- 49049 <br /> •a1o.,e ror moat - otalw�0a mnew rel 1 w xsc U2st.s <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(ax3)1. 490.10 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6715 CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99-OTHER(Specify) 490.32 <br /> 40.33 <br /> UPCF UST-D(122007)IN <br />
The URL can be used to link to this page
Your browser does not support the video tag.