Laserfiche WebLink
ARAVEL <br /> Monitoring System Certification-Page 3 of 3 <br /> JUL 01 2015 <br /> ,Ia <br /> Site Address: 1409 S Airport Way sting^/Servicing: 616/13((JJ �Nr1 <br /> 1!eelTu n�7POTA[elT <br /> F. In-Tank Gauging/SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> FEDYes <br /> e the followingchecklist: <br /> ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup?❑ No* Was accuracy of systemproduct level readings tested?❑ No* Was accuracy of system water level readings tested?❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLD's are not installed. <br /> Com let e the following checklist: <br /> ertification was a leak simulated to verify LLD performance? <br /> ® Yes ❑ No* For equipment start-up or annual equipment c <br /> ❑ N/A (Check all that apply) Simulated leak rate: ® 3 g.p.h.(1.); ❑ 0.1 g.p.h.(2.); ❑ 0.2 g.p.h.(2.).. <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required onlyfor electronic LLD start-up. <br /> ® Yes ❑ No* Were all LLD's confirmed o erational and accurate within regulatory requirements? <br /> ® Yes —E No* Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> o N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> ® N/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />