Laserfiche WebLink
SWRCB, January 2002 <br /> Page > of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer ❑Industry Standard C Professional Engineer <br /> ❑Other(Spec) <br /> Tasst Method Used: ❑Vacuum <br /> �`Pressure ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used tpssKc 5 PSS Nr�yr <br /> w Equipment Resolution: to IS 1�sr <br /> :,v..wr.a.e , '..4 _ .. •'„ ry-Sxl. ,S.r..za s+ ero >,.^�,, xv .a <br /> Piping Run#1 Piping Run# Z Piping Run# Piping Run # • �, <br /> Piping Material: -C-)6 t o L F <br /> Piping Manufacturer: <br /> .. �NV P1rUN ENV CYVVI Sven ` Sl.k <br /> Piping Diameter: <br /> Length of Piping Run: vox l 25 ' <br /> Y , t25 A _ 1zo � yo, <br /> Product Stored: e U a L r, 4Sa L IY q }Z� a ✓ 8 Veti <br /> u <br /> Method and location of Ts 6 oa{ a 1 } boat a I Trs�boa} a T <br /> i in -run isolation: r &1 n•v, Su». rtL u a1 tZ Baal <br /> • e between applying <br /> �c <br /> sur acuum water and <br /> startin test <br /> Test Start Time: <br /> (0 : 3D 10. 30 E0 - 30 (Ut 3D <br /> Initial Reading(Rd: 5 p sx <br /> 5C'sI Nos Psi <br /> Test End Time: t Z. 3 v <br /> Final Reading(RF): 5 P 5.p Sr l Z 3!7 <br /> SPsx l� sr <br /> Test Duration: 2 (^ <br /> Z -uta.rr Z, <br /> Change in Reading(RF-RO: ex 171c2 Cyf T lI S7• � PSL' <br /> Pass/Fail Threshold or <br /> Criteria: N0 Lusz S <br /> Ne loss . {� o C.usst . �s't No Loss PSS <br /> Test Result: Pass ❑Fail Pass ❑Fail ass ❑Fail Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing and recommended ollow up or ailed tests) <br />