My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO 2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:31 AM
Creation date
11/2/2018 8:12:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\COMPLIANCE INFO 2004-2007.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRcu,January 2002 Page _(n of 8 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standardofessional Engineer <br /> ❑Other(Specify) lo - <br /> Test Method Used: ❑Pressure ❑Vacuum �Odrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:CQ I Jule L,,,c L T j C c r. 4-W Equipment Resolution:,p C/�_ K__ <br /> UDC# .1- tL UDC# 3 s• UDC# 5 t 6 UDC# <br /> UDC Manufacturer: Eh V rt un Ert� vV. <br /> UDC Material: T'ot Y� p / <br /> UDC Depth; 15 " 30 30u <br /> Height from UDC Bottom to Top Va?w k-2-11 VCtpo♦ 0-" k 1 <br /> of Highest Piping Penetration: `t h�aA,.c+-SII' ✓od. c 7' <br /> Height from UDC Bottom to toll <br /> Lowest Electrical Penetration: O 12.E' 2! <br /> Condition of UDC prior to <br /> testing: �r (� r� D <br /> Portion of UDC Tested wa+u- Le w4-l--.v Lw IS" ulaf a Lr 4 1 g i <br /> Does turbine shut down when <br /> UDC sensor detects Hquid(both �''1'es ❑No ❑NA ) as ❑No ❑NA I 1 es ❑No ❑NAVEON <br /> product and water)? <br /> ater ?� res <br /> / \ , \ <br /> Turbine shutdown response time N a 6(.c(a t W 0 U.✓t ICod <br /> Is system programmed for fail- <br /> safe shutdown? XYes 11No ❑NA es ❑No [INA es ❑No [INA 0 Y No ❑NA <br /> Was fail-safe verified to be <br /> o emtil? ❑yes�o ❑NA ❑Yes�Ao El ❑Yes o ❑NA ❑ ❑ o 11 NA <br /> ona <br /> Wait time betwee g <br /> pressure/vacu water d <br /> startingtest <br /> Test Start Time: 1 1 Z S (l'•z0 I I y S <br /> Initial ReadingFr✓si cn cl Sr s l cr cl r f c n c b <br /> Test End Time: l7-: 1S" <br /> Final Reading(RF): ✓si cc ctP 1 r s� Circ e - r,,sf-4 rVCf <br /> Test Duration: 3o i'.t w.. ?U �-+nw 3 o <br /> Chane in Reading(RF-RI): o No (J � <br /> Pass/Fail Threshold or Criteria: a 0 30 o f n , 0 0 5` 3d "z- a <br /> Test Result: lass ❑Fail ass ❑Fail NUass ❑Fail Mn <br /> Was sensor removed for testing? es ❑No ❑NA es ❑No ❑NA es ❑No ❑NAWas sensor properly replaced and yes ❑No ❑NA es ❑No ❑NA es ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include.information on repairs made prior to testing, and recommended follow-upforfailed tests) <br /> if the entire depth of the UDC is not tested,specify how much was tested. if the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.