Laserfiche WebLink
Spill Containment— OPW EVR Thread-on or OPW/ppME <br /> certified for installation on the Opal phase 1 EVR system. Ald fill orts <br /> feature enhanced 1 DK-2100-EVR vapor ti ht drai C© EVR Multi-Port Spill Containers are <br /> a maximum vapor leak P rn these spit! containers <br /> g n valves that exceed the EVR re Hers <br /> feature a rate of 0.17CFH at 2.0 inches H2O. The vapor return spill cont <br /> \, _ Permanent plug installed in the drain ports, as per EVR re requirements for <br /> � containers <br /> Overfill Prevention — requirements. <br /> The OPW 6150-400C_EUR Series Overfill Prevention Valves are certified <br /> installation v the OPT Phase 1 EVR system. The vapor ti <br /> positive shut-off of product delivery, before an overfill condition Occurs, for <br /> without intervention from the transport driver, p tight EVR 6150's are designed to provide <br /> threaded lower tube connection, and exceeds the EV l per EPA requirements <br /> The valve features a seated float pivot and a <br /> rate of 0.17CFH at 2.0 inches H20. The 61 SO-EVR Series Valy <br /> R requirement for a maximum vapor leak <br /> EVR Spill Container with the patent pending 61JSK lack Screw device. T <br /> liquid m the spill container to be drained directly into thee is installed in the base of the Ops <br /> valve from the tank ullage, eliminating a notorious leak point in his configuration allowsin <br /> drop tube, thereby isolating the drain <br /> Tank Bottom Protector— The OPW/POMECO 6111-1 Previous systems. <br /> for installation at the bottom of the overfill revention vale <br /> underground storage tank from sustaining 400 Tank Bottom protector is EVR certified <br /> e drop tube to help prevent the <br /> ^` T g amage from erosion or tank gauging sticks. <br /> - - Ball Float and 233 Extractor— <br /> The OPW 53VM1 gall Float, 233 Extractor and <br /> 6 1 T Fill Drop Tube configuration can be installed as an <br /> Overfill application. The installation of the gall Float/Drop T be y the is SO <br /> n the Tube system s <br /> identical to the 61 SO Overfill Valve oe OpW Phase 1 Vapor Recovery System, <br /> Rotatable Swivel Adaptors (Fill and Vapor) — <br /> for installation on the fill and vapor parts on the OPW <br /> P � OPW EVR Rotatable Swivel Adaptors are certified <br /> daptors <br /> from <br /> 360 degrees of rotation of an Phase 1 EVR system. OPW Swivel Ada <br /> from loosening on the spill y product or vapor recon for <br /> p container risers. OPW Swivel Adaptors exceed the EVR rePrevent quirement to <br /> maintain a minimum 360-degree rotation with an average static torque <br /> Pounds (9 foot-pounds). The enhanced po pet system on t q <br /> adaptor provides a vapor tight seal when p he OPW 61 VSA-to exceed 108 it <br /> closed, per EVR requirements. EVR vapor swivel <br /> Adaptor Toa! —An OPW 61 SA-7001 is re <br /> Swivel Adaptors, spill containers and threaded riser adaptors per <br /> required to ensure proper installation of DPW Rotatable <br /> 61SA-TOOL includes provisions for the use of a torque wrench to facil- <br /> itate and testing. EVR requirements. The <br /> t <br /> e <br /> accurate installation <br /> Dust Caps (Fill& Vapor) ` OPW EVR Dust Caps are certified for installation on <br /> OPW EVR Certified Rotatable Adaptors. OPW EVR Certified D <br /> enhanced ribbed seals and increased sealing forces to <br /> , "Sii seal, Per EVR requirements. Available in D ust Caps feature <br /> s <br /> uratuff or low profit metal models. <br /> Threaded Riser Adaptor(Face Se <br /> Adaptor is required to provide a flat, Adaptor) <br /> seating surface on threaded <br /> A. exists per EVR requirements. The FSA-400 is ) An Oce n thre 0 Threaded Riser Face Seal <br /> container to provide a true sealing surface for the droptube {d d pipes where a gasket seal <br /> Overfill Prevention Valves. The FSA-400 is also stalled t the fill pipe riser below the spit! <br /> optional on vapor risers and rotatable adaptors. flange °n the 6 s, though <br /> EVR <br /> required on tank gauging risers, though is <br /> Pressure Vacuum Vent— The OPW 623V pressure Vacuum <br /> OPW Phase 1 EVR system. The 623V's are installed on the t <br /> "� ° Vent is certified for installation on th <br /> fuel storage tanks. The vent cap and internal <br /> — lines against intrusion and blockage from water, debris or • op of the vent pipes for underground <br /> wire screen are designed to protect the tank vent <br /> the valve opens at a predetermined pressure or vacuum settingto <br /> 623V exceeds the EVR requirement of a maximum vapor leak ate A normally closed poppet in <br /> allow the tank to vent. The <br /> Of 0.17CFN at 2.0 inches H20, <br />