Laserfiche WebLink
2 <br /> P <br /> Environmental Testing, L.L.C. <br /> 1929 Tyler Avenue,Suiten ■ South EI Monte • CA 911-33-3522 <br /> 1vww.shi'rleyenvlronmentaLeam <br /> Page 2 of 3 <br /> Prazen-Hill <br /> 918/2003 <br /> Enhanced Tracer Tilghtg Construction Price 4,630.00 <br /> Terms: <br /> • After regulator acceptance of work plan a 72-hour minimum notice shall be given to Shirley to performhorizontal probe <br /> installation in tank bed and piping trenches. <br /> • 72 hour minimum notice shall be given to Shirley to perform site inoculation. <br /> * 72 hour minimum notice shall be given to Shirley to perform site sampling. <br /> • <br /> On site analysis is not included in this estimate.There is a seven to fourteen day turn around before laboratory results can be <br /> processed. <br /> • Payment of 50%is due upon signing of contract and balance due upon receipt of final report. Mail to: Shirley Environmental <br /> Testing L.L.C., 1928 .Tyler Rd.,Suite K,South El Monte,CA 91733. <br /> • Work Plan will be submitted to regulator for approval. Should contract not be awarded within 60 days from date ofproposal SET <br /> will bill owner$500.00 for preparation and submittal of work plan, <br /> • Price does not include any pinpointing of leak confirmation. <br /> • Price does not include any local or state sales tax. <br /> • Price does not include any required permits,fees for drilling or monitoring probes that are considered wells by local or county <br /> agencies. <br /> • Price docs not include any required safety requirements(including safety orientations and/or classes)a <br /> plans. nd/or site-specific safety <br /> + Tanks must be accessible for tank inoculation and site must be clear and accessible for probe installation. <br /> • Customer must supply site map delineati.ug all components to be tested;Tanks,Product Lincs and Vent.Lines. <br /> * Quotation does not include rernoval of probes after cornpletion of testing. <br /> • Site Vapor Remediation system must be turned off during the entire test phase(7 to 14 days). <br /> • A Stand-by rate may occur for any delays caused by the owner of the site after temng has been initiated. <br /> • Client assumes all responsibility for identifying buried utilities such as electrical,natural gas, water,sewer,telephone, <br /> Communication lines,and all underground product,vent, vapor,and or siphon piping related to the tank top equipment, <br /> dispensers,and vents. <br /> • Any regulatory changes by the regional or local agencies may change the total number of data points(probes). A change would <br /> alter the f nal price. <br /> • Breaches in primary piping,tanks, vent lines,and or vapor lines will result in false failure reports of the system are the <br /> responsibility of the client_ The Tracer compound is extremely volatile and SET technicians should be notified of releases of <br /> Tracer Testing compound. <br /> • This quotation kv valid fpr Thirty(30)Days <br /> 2 <br />