Laserfiche WebLink
Note: Enhanced Leak Detection (ELD) must be performed prior to the final inspection. A <br /> separate permit application is required to install IFLD. <br /> 2. TO BE SUBl 'TTED PRIOR TO THE FIIVAL INSPECTION.• <br /> ❑ Complete to scale As-Built Plans FH <br /> ❑ Complete Monitoring and Response Plan DC <br /> ❑ UPCF Underground Storage Tanks - Installation <br /> tank) FH Certificate of Compliance (one farm per <br /> ❑ Completed Underground Storage Tank Certs kation Of1"iLE cial Responsibility form along <br /> with any required attachments DC <br /> ❑ Passing Line Leak Detector Test Results FH <br /> ❑ Passing Line Tightness Test Results(Required if the UST system does not satisfy the <br /> California Code of Regulations 263+6(g)for automatic pmp shut-of:) FH <br /> ❑ Passing Enhanced Leak Detection Results FH <br /> D• INSPECTIONS: <br /> FH <br /> Note, A representative from the San Joaquin County Enviranmehtal Health Department <br /> must witness all activities described below. <br /> ❑ Tank holiday test (for fiberglass-coated steel tanks) performed prior to installation in <br /> excavation <br /> ❑ Inspection of tank vacuum gauge(if applicable)prior to placement in excavation <br /> ❑ Tank soap test (for fiberglass tanks)performed prior to installation in excavation <br /> ❑ Verification of tank set and anchorage in excavation <br /> ❑ Primary piping including product piping, vapor recovery and vent line piping soap and <br /> pressure test <br /> ❑ Secondary piping including product piping, vapor recovery and Vent line piping soap and <br /> pressure test <br /> ❑ �4-Hour secondary containment Iake test on sumps and under-dispenser containuzent <br /> ❑ Visual inspection of piping to ensure proper slope prior to covering <br /> ❑ Overfill performance test <br /> ❑ Prior to receiving fuel, a complete functional test of tank and piping monitoring systems) <br /> including overfill prevention <br /> ❑ Final inspection and demonstration of automatic shut down(if applicable). <br /> - S - <br /> 90 3Wd 800-12 HIJI3 <br /> E�bE89b6gT. TC_gT cran�ranirT <br />