My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 10:27:44 AM
Creation date
11/2/2018 8:14:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\INSTALL 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Note: Enhanced Leak Detection (ELD) must be performed prior to the final inspection. A <br /> separate permit application is required to install IFLD. <br /> 2. TO BE SUBl 'TTED PRIOR TO THE FIIVAL INSPECTION.• <br /> ❑ Complete to scale As-Built Plans FH <br /> ❑ Complete Monitoring and Response Plan DC <br /> ❑ UPCF Underground Storage Tanks - Installation <br /> tank) FH Certificate of Compliance (one farm per <br /> ❑ Completed Underground Storage Tank Certs kation Of1"iLE cial Responsibility form along <br /> with any required attachments DC <br /> ❑ Passing Line Leak Detector Test Results FH <br /> ❑ Passing Line Tightness Test Results(Required if the UST system does not satisfy the <br /> California Code of Regulations 263+6(g)for automatic pmp shut-of:) FH <br /> ❑ Passing Enhanced Leak Detection Results FH <br /> D• INSPECTIONS: <br /> FH <br /> Note, A representative from the San Joaquin County Enviranmehtal Health Department <br /> must witness all activities described below. <br /> ❑ Tank holiday test (for fiberglass-coated steel tanks) performed prior to installation in <br /> excavation <br /> ❑ Inspection of tank vacuum gauge(if applicable)prior to placement in excavation <br /> ❑ Tank soap test (for fiberglass tanks)performed prior to installation in excavation <br /> ❑ Verification of tank set and anchorage in excavation <br /> ❑ Primary piping including product piping, vapor recovery and vent line piping soap and <br /> pressure test <br /> ❑ Secondary piping including product piping, vapor recovery and Vent line piping soap and <br /> pressure test <br /> ❑ �4-Hour secondary containment Iake test on sumps and under-dispenser containuzent <br /> ❑ Visual inspection of piping to ensure proper slope prior to covering <br /> ❑ Overfill performance test <br /> ❑ Prior to receiving fuel, a complete functional test of tank and piping monitoring systems) <br /> including overfill prevention <br /> ❑ Final inspection and demonstration of automatic shut down(if applicable). <br /> - S - <br /> 90 3Wd 800-12 HIJI3 <br /> E�bE89b6gT. TC_gT cran�ranirT <br />
The URL can be used to link to this page
Your browser does not support the video tag.