Laserfiche WebLink
Oct 09 03 09: 13a AIRNET 99371087 <br /> p. l <br /> TANK STORAGE 30--23 <br /> (h) Where the means of secondary containment is 2.3.2-5.3 Openings for gauging on tanks storing Class I Iiq- <br /> iclosed, it shall be provided with emergency venting in aids shall be provided with a vaportight cap or cover. <br /> cordance with 2.23.2. <br /> (i) Means shall be provided to establish the integrity of 2.3.2.5.4* Fill pipes that enter the top of a tank shall termi- <br /> nate within 6 in.(190 mm)of the bottom ofthe tank.Fill pipes <br /> x,4,2.4.The secondary containment shall be designed to with- shall be installed or arranged so that vibration is minimized. <br /> y <br /> stand the hydrostatic head resulting from a leak from the pri- Exception No. 1, fill pipes in tanks whose vapor span under the ew- <br /> maty tank of the maximum amount of liquid that can be pected range of normal operating conditions is not in the flammable <br /> stored in the primary tank. range or is inerted need not mist this requirement. <br /> 2.3.2.5.4 Equipment,Piping,and Fire Protection System,in Exception No. 2: Fill pipes in tanks hand'ung liquids with minimal <br /> Remote Impoundment Areas or Diked Areas- potential for accumulation of static electricity+nerd not meet this m <br /> quirement provided that the fill fire is deigned and the system is oper- <br /> 2,3-2.3.4.1* Piping Location. Only piping for product, util- aced to auoid mist generation and an adequate keel of residence time <br /> ity,or fire protection purposes directly connected to a tank or is provided downstream of fitters or sarens such that the charge goner_ <br /> tanks within a single diked area shat[ be routed through a aced is dissipated <br /> dik <br /> area,a <br /> e impoundment arm a <br /> to and mo impoundment area, r above a storrageatank drain 2-3.2.5.5 filling and emptying connections for Class 1,C1�II, <br /> age area where the piping can be exposed to a fire. and Class IIIA liquids that are connected and disconnected <br /> shall be located outside of buildings ata location free from any <br /> Exception: Piping for other product lines and from adjacent tanks source of ignition. They shall be located not less than 5 ft <br /> .shall be permitted to be routed lhrnugh such areas if engineering de- (1,5 m)away from any building opening.Such connections for <br /> signs are provided to incorporate features to prrurnl the piping from any liquid shall be closed and liquid tight when not in use and <br /> creating an exposure hazard. shall be properly identified. <br /> 2.3.2.3.4.2 Drainage. Drainage shall be arranged to prevent 2,3.2.6 Requirements for Abovegrormcl Tanks Located in An <br /> accumulation of any liquid under the piping by sloping the PAS Subject to Flooding. <br /> grade in accordance with 2,3.2.32. Corrosion-resistant pip- <br /> ing and piping that is protected against corrosion shall be 2.3.2.6.1 Vertical tanks shall be located so that the tops of the <br /> permitted to be buried where such drainage is not provided tanks extend above the maximum flood stage by at least 30 <br /> or is not practical. percent of their allowable storage capacity. <br /> 2.3.2.3.4.3* Equipment Location. If located in a remote 2.3.2.6.2 Horizontal tanks that are located where more than <br /> impoundment area,a diked area,or a spillway draining to a 70 percent of the tank's storage capacity will be submerged at <br /> remote impoundment area, process equipment, pumps, the established flood stage shall be secured by one of the Fol- <br /> instrumentation,and electrical utilization equipment shall be (owing methods: <br /> located or protected so that a fire involving such equipment (1) Anchored to resist movement <br /> docs not constitute an exposure hazard to the tank or tanks in (2) Attached to a foundation of steel and concrete or of con- <br /> thesame area for a period of time consistent with the response trete having sufficient weight to provide adequate load <br /> and suppression capabilities of the fire-fighting operations for the tank when filled with liquid and submerged by <br /> mailable to the location. flood water to the established flood stage <br /> 2.3.2,3.4,4 Fire protection Systems. Hose connections, con- (3) Adequately secured from floating by other means <br /> trots,and control valves forapplication of fire protection foam Tank vents or other openings that are not liquidtight shall <br /> or water to tanks shall be located outside remote impound- extend above the maximum flood stage water level. <br /> stent areas, diked areas, or spillways draining to a remote 2,3.2.6.3 A dependable water supply shall be available fill- <br /> ingforimpoundment area. an empty or partially filled tank. <br /> 2.3,23.4.5 Combustible Materials. Structures such as stair- Exception: ll'ltere felling the tank with wateris unpractical orhaxard. <br /> I-)",walkways,instrumentation shelters,and supports for pile ow because of the contents of the tank, the lank shall be prwlected by <br /> 1219 and equipment that are located in a remote impoundment other means against movement or collapse. <br /> arca,diked area, or spillway draining to a remote impound- <br /> mentarea shall be constructed of noncombustible materials. 2.3.2.6.4 Spherical or spheroid tanks shall be protected by <br /> 2.3.2,4 Vent Piping for Aboveground Tanks. Piping for nor- any of the methods specified in this subsection. <br /> coal and emergency relief venting shall be constructed in 2'3.2'7 Installation Instructions- Factory-built aboveground <br /> accordance with Chapter3. tanks shall be provided with instructions for testing and for <br /> 2.3-2.5 T Other than Vents for Aboveground installation of the normal and emergency vents. <br /> aids Openings <br /> Tom. 2.3.3 Installation of UndergroundTanks. <br /> 2'3.2.5.1 Each connection to an aboveground tank through 23.9.1 Location. Excavation for underground tanks shall be <br /> Much liquid can normally flow shall be provided with an inter- made with due care to avoid undermining of foundations of <br /> s'tl°ran external valve looted as close as practical to the shell existing structures.Underground tanks or tanks under build- <br /> ""the tank ing3 shall be so located with respect to existing building foun- <br /> 2.3.2,5 2 q g dations and supports that the loads carried by the latter <br /> Each connection below the liquid level through cannot be transmitted to the tank-The distance from any pan <br /> liquid does not normal! flow shall be provided with a of a tank storm ass li base- <br /> hrlu,,Id ht g ClI quids to the nearest wall of an y <br /> g closure such as a valve,plug,or blind,or a combi- mens or pit shall be not less than 1 ft(0.3 m),and to any prop- <br /> �ruinn oFthese_ <br /> arty line that can be built upon,not less than 3 ft(0.9 m).The <br /> 2000 Edison <br />