Laserfiche WebLink
f ► <br /> PLASTE °EL <br /> TRO Double-Wall <br /> )INSTALLATION INSTRUCTIONS Tank <br /> I. GENERAL may set and securely anchor the ELUTRONO tank on the pad <br /> The PLASTEEL'ELUTRON' underground tank is a with a minimum of 6" of backfill between tank bottom centerline <br /> U.L, Listed Jacketed tank providing corrosion protection and 360° and the pad.Upon local implementing agency approval,you may set <br /> secondary containment per U.L. 1746 and 58, and securely anchor the ELUTRON' tank directly on the <br /> smooth, flat pad taking care to place a 12" wide x I" thick piece <br /> ELUTRON'underground tanks must be installed according of felt between the entire tank bottom centerline and the pad to <br /> to these installation instructions, the latest issue of the Flammable minimize damage during placement. Consult factorfor other <br /> and Combustible Liquids Code, N.F.P.A. 30 for underground tanks anchoring techniques. y <br /> and the authority having jurisdiction. <br /> The installer and/or owner must read and be familiar with the V1. TESTING <br /> entire installation instructions and Appendix A prior to installingthe <br /> PRE-INSTALLATION: Aboveground, prior to replacement of <br /> ELUTRON' tank. To activate the PLASTEEL' tank in excavation,precisely follow one of the three testing options <br /> ELUTRON®Tank Warranty,a completed and signed Certificate cited in Appendix A attached. Do not deviate from these procedures. <br /> of Installation for the PLASTEEL' ELUTRON' If the ELUTRON' tank is delivered with a vacuum on the <br /> Underground Tank must be returned to the manufacturer. For interstice,refer to Option#2 of Appendix A. <br /> additional installation references,consult the current editions of. CAUTION: IF OPTION #3 IS USED, DO NOT APPLY ANY <br /> — Petroleum Equipment Institute, RP-100 <br /> — American Petroleum Institute, RP-1615. PRESSURE TO THE INTERSTICE BEFORE <br /> THOROUGHLY UNDERSTANDING AND FAITH- <br /> VISUAL INSPECTION FULLY FOLLOWING THE PROCEDURES CITED <br /> IN OPTION #3 OF APPENDIX A. DAMAGE TO <br /> Prior to setting tank in hole, inspect exterior for damage. If tank TANK MAY OCCUR IF YOU DEVIATE FROM <br /> exterior is damaged,call factory regarding correct repair procedures. THE PROCEDURES AND SPECIFICATIONS. <br /> Exterior damage is indicated when the blue color of the FRP <br /> POST-INSTALLATION: Complete the backfill procedures to <br /> laminate has shown a white fractured pattern. <br /> the top of the tank. Complete all piping and connections ensuring <br /> �IIh HANDLING that unused openings are secured tight with threaded steel plugs. <br /> Apply a 5 PSIG pressure test in the primary tank and check for tight- <br /> Good construction engineering practice,common sense and safety ness of piping connections and tank manhole covers. Gauge should <br /> must prevail during this phase. ELUTRON' tanks are not to be be checked prior to testing for accuracy and have a maximum limit <br /> dropped or rolled off of the delivery vehicle onto the ground or into of 15 PSIG. <br /> the hole.The lifting hook or hooks provided must be used in combi- CAUTION: THE PRIMARY TANK TEST PRESSURE SHALL <br /> nation with the proper capacity unloading equipment. It is the NOT EXCEED 5 PSIG. DAMAGE TO TANK <br /> responsibility of the owner to provide the qualified personnel and MAY OCCUR. ISOLATE PIPING FROM TANK <br /> safe,proper unloading equipment, with specific consideration given BEFORE TESTING THE PIPING AT HIGHER <br /> to tank weight and reach distance to set tank in excavation. The PRESSURES. <br /> preferred lifting cable included angle is 600 and must never exceed <br /> 120°.A spreader bar may be used to achieve this angle. The interstice(annular space)will be tested using option#2 or#3 <br /> in Appendix A. <br /> IV. EXCAVATION DEPTH, OPTION See Appendix B for procedures to perform the <br /> BEDDING AND BACKFILL Interstitial Vacuum Test that has been third party <br /> Follow all applicable local regulations and codes. When evaluated to meet the EPA tank tightness test <br /> protocol. <br /> excavating,allow a minimum clearance of 6"for backfill around the <br /> tank.For minimum burial cover,consult N.F.P.A.30.If burial cover VII. VENTING <br /> aver top of tank exceeds five (5) feet, consult factory. Backfill <br /> materials should he clean, debris free, sand or pea gravel. The PRIMARY (inner) tank must always he vented to <br /> Hydrocarbon exposed sand or pea gravel may he re-used if approved atmosphere. The interstitial space does not require venting, <br /> by the AHJ. Native sand may be used if approved by [he tank man- However, local codes may require such interstitial venting. Comply <br /> ufacturer and the AHJ.Allow a minimum of 12"of backfill between with N.F.P.A. 30. <br /> traffic slab and all appurtenances that are attached to the tank. CAUTION: DO NOT MANIFOLD VENT FROM PRIMARY <br /> Damage to tank may occur if surface traffic loads are transmitted TANK TO VENT FROM INTERSTITIAL SPACE. <br /> directly to tank. <br /> ;V. ANCHORING SYSTEMS VIII. PLASTEEL"' SEALING <br /> PROCEDURES <br /> CAUTION: The decision to use an anchoring system is the These procedures must be erformed <br /> responsibility of the owner. Damage to the tank may p prior to completion of <br /> m y backfill alnd AFTER TESTING. TO ensure complete corrosion pro- <br /> occur if the tank is subjected to movement. Lection, the following instructions must be followed: <br /> Consult the factory for number, size and type of holddown a. General instructions for working with fiberglass resin <br /> assemblies required when using a concrete pad under the tank. You By carefully performing the following steps,your ELUTRON" <br />