My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 10:27:44 AM
Creation date
11/2/2018 8:14:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\1427\PR0521942\INSTALL 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> P LA STE E I- @E LUTR0111%@Double-Wall <br /> APPENDIX A Tank <br /> INSTALLATION SITE TESTING PROCEDURES <br /> Option #1: EXTERIOR HOLIDAY TEST Option #2: VACUUM TEST INTERSTICE <br /> Prior to arrival of the Elutron a tank at the installation The Elutron a tank may he delivered with an -interstitial vacuum established at <br /> site, coordinate with the Elutron0 manufacturer to have the factory. The delivery document will state the vacuum gauge reading required <br /> a 12,500 volt holiday test performed using a Tinker-Rasor, for acceptance a[ the delivery location. Record the vacuum gauge reading on the <br /> Model APW, tester. Any pinholes detected must be delivery document when the tank is delivered. If the vacuum gauge has decreased <br /> repaired using the PlasteelO sealing kit materials. Re-lest from the vacuum gauge reading listed for acceptance on the delivery document, <br /> and repair until tank is pinhole free. This test must be call the factory for further instructions. if an interstitial vacuum is to be established <br /> performed by a person qualified by the Elutron0 tank at the installation, follow the instructions in Appendix B. interstitial Vacuum Test. <br /> manufacturer. DO NOT apply a vacuum to the primary tank, DAMAGE MAY OCCUR <br /> Option #3: PRESSURE TEST INTERSTICE <br /> If a field pressure test is required, set-up test equipment per the schematic diagram and precisely follow the test procedures listed. <br /> CAUTION: DAMAGE TO TANK MAY OCCUR IF PRESSURE IN THE <br /> INTERSTICE EXCEEDS 2 PSIG ABOVEGROUND. <br /> Step I. Ensure gauges are accurately calibrated. $• Observe G2 for 30 minutes. G2 should remain at <br /> 1112 -2 psig. (Call factory if G2 decreases to zero.) <br /> 2. Ensure all connections are leak tight. g. Open V3, vent interstice, G2 to read zero. <br /> 3. Close V2, open V3, G2 should read zero. 10. Open V1, vent primary tank, G1 to read zero. <br /> 4. Open V1, pressurize primary tank until G1 reads Test complete. <br /> 3-5 psig, close V1. Disconnect air source. NOTE: If the Elutron0 tank is covered with backfill, you may <br /> 5. Close V3, after 30 minutes,check G2. G2 should read test the interstice at 3-5 PSIG, following steps #1-10, and carefully <br /> zero, (Call factory if G2 does not read zero.) increasing the pressure in step #7 to 3-5 PSIG. In step #8, G2 should <br /> 6. Open V1 and decrease G1 to 1112 -2 psig. Close V1. remain at 3-5 PSIG. <br /> i 7. Open V2, pressurize G2 to 1112 - 2 psig. Close CAUTION: DAMAGE MAY OCCUR IF INTERSTICE <br /> V2. DO NOT EXCEED 2 PSIG ON G2 DAMAGE PRESSURE EXCEEDS 5 PSIG. WHEN TANK IS <br /> TO TANK MAY OCCUR. COVERED WITH BACKFILL <br /> Pressure Test E ut ment Specifications PRESSURE BLEED-OFF VALVE (V3) <br /> Gauges: 5 psig maximum scale <br /> Valves: Globe type, 30 psi min. VALVE (vt} <br /> VALVE <br /> Pressure Relies'Device: 5 psig max. 2) MZ82MWZMMAIR SOURCE <br /> INTERSTICE PRESSURE GAUGE (G2) <br /> (G)) <br /> PRIMARY TANK PRESSURE GAUGE <br /> MONITOR 5 PSIG <br /> FITTING PRESSURE <br /> RELIEF <br /> DEVICE <br /> FRP LAMINATE <br /> SECONDARY WALL PRIMARY TANK <br /> FITTINGS <br /> INTERSTICE <br /> STEEL PRIMARY <br /> INNER TANK <br /> MONITOR TUBE <br /> Authorized PLASTEELO ELUTRONO tank manufacturers <br /> INDJSTRIA JAPAN JEEWON METAL TANQUES 20RN <br /> HTab.Hu g TVG ACERD STEEL WORKS INDUSTRIAL CO LTD. JOOR MFG K 8 T STEEL PRODUCTS GUMEX TANX INC INDUSTRIES <br /> Tab.Hungary Quito.Ecuador Tokyo.Japan Seoul.Korea Escondido,CA Twin Fafls,ID Suwanee.GA Torreon.Mexico Ciarerrunt,NH Elkhart,IN <br /> 35-84-320.211 593.2.543600 81-423.30.8007 82.2-555.0821 (619)745-0971 (206)733.2554 1404)945-8383 52-17-50-6110 (603)543-1272 (219)266-1433 <br /> Fax 36.84-320-624 Fax 593-2-503.633 Fax 81.423-30.8022 Fax 82.2.585.0820 Fax(619)745.9515 Fax(208)733.7239 Fax(404)932-5671 Fax 52.17-505130 Fax(603)543.1270 Fax(21 9)266.1012 <br /> FORM INST-J-12-95A <br />
The URL can be used to link to this page
Your browser does not support the video tag.