Laserfiche WebLink
• 3 43"x 1.9" Fiberglass Dispenser Pans with all impact valves, stainless <br /> flex connectors and liquid sensors. <br /> • 4 6" x 6" x 6' Square Bump Poles <br /> • 1 Power Integrity Panel Model PPC 4D4S12EP for fueling system only <br /> • 1 IPSP1C01-1000-C Uninterrupted Power Supply <br /> • 1 8' x 30" x 18" Monument Footing <br /> All Product Piping Shall be Sch.80 Steel Encased in the Petro First Vault under <br /> vacuum. <br /> All vent piping will be Smith Fiberglass Double Wall under vacuum. <br /> Includes Line Test, Vapor Test and Post SB-989 Testing 6 months after <br /> stmt up. <br /> Includes start-up and calibration of all vapor and dispenser systems. <br />