My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2651
>
2300 - Underground Storage Tank Program
>
PR0504354
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2019 10:03:25 AM
Creation date
11/2/2018 8:25:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0504354
PE
2381
FACILITY_ID
FA0006174
FACILITY_NAME
Best Express Foods Inc
STREET_NUMBER
2651
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16912003
CURRENT_STATUS
02
SITE_LOCATION
2651 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\2651\PR0504354\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r^ <br />.*SAN SAN JOAOUIN COUNTY <br />+o <br />�, COMMUNITY DEVELOPMENT DEPARTMENT <br />1810 E HAZELTON AVE, STOCI(TON. CA 95205 <br />• �'�Tp S-p{i�� DEVELOPMENT SERVICES PHONE 12091 468.3120 <br />PLANNING PHONE 12091468-3120 <br />BUILDING PHONE 12091 468.3123 <br />NEIGHBORHOOD PRESERVATION PHONE (2091 468.3021 <br />Project Location <br />Owner farm arall <br />Contractor <br />BACKFILL EXCAVATION CERTIFICATE <br />?hone No. <br />License No <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br />completion, or <br />_ 2. Submission of verification, e.g. load ticket, within 30 days of project <br />completion that one of the following materials was placed in the excavation in <br />12" lifts: <br />_ A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br />inch in diameter. <br />_ B. Crushed rock - self -compacting material not more than three-quarters <br />(3/4) inch in cross sectional measurement. (Use of crushed rock <br />will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or <br />similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br />of project completion, or submission of verification that the select material described above <br />will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br />that the entire excavation will be backfilled and compacted to insure compliance with the <br />Uniform Building Code Appendix Chapter 70. <br />* ZAW G a <br />Name (Print) <br />Title (Print) <br />SigrFature <br />* Shall be the responsible managing employee on the license or authorized <br />agent. <br />6/91—LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.