My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
442
>
2300 - Underground Storage Tank Program
>
PR0231908
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2019 10:36:15 AM
Creation date
11/2/2018 8:26:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231908
PE
2381
FACILITY_ID
FA0003524
FACILITY_NAME
UTSI Tire Service
STREET_NUMBER
442
Direction
N
STREET_NAME
AIRPORT
STREET_TYPE
Way
City
Stockton
Zip
95205
APN
15113053
CURRENT_STATUS
02
SITE_LOCATION
442 N Airport Way
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\442\PR0231908\REFERRAL 2000.PDF
QuestysFileName
REFERRAL 2000
QuestysRecordDate
12/5/2011 8:00:00 AM
QuestysRecordID
96357
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PRO(' R W <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division,phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before maldng the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name <br /> Facility Address <br /> A. Describe the frequency of performing the monitoring: <br /> Tank ? r N ,L <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monimring: , <br /> Tank <br /> Piping �-4 �y✓ <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> D. List the name(s) and titles) of the people responsible for performing the monitoring <br /> and/or maintaining equipment: <br /> E. Reporting form�` for monitoring: <br /> Tank /cc Irk- <br /> Piping <br /> F"'F:'' Describe'fl 1preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance sched <br /> but not less than every 12 months: <br /> G. Describe the training necessary for the operat Son of UST stem, including piping, <br /> and the monitoring equipment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.