Laserfiche WebLink
r <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page I of 2) <br /> 490.1 <br /> TYPE OF ACTION ❑1.NEW PIAN FL 2.CHANGE OF INFORMATION 49x2 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. <br /> (Check one item only) 2.THIS PLAN COVERS ONLY I FACTHE LOWIN INFOG UST RMATION <br /> FACILITY ID#(Agency Use Only) 3. <br /> BUSINESS NAME(Same as FACILITY NAME). L'9, <br /> Al <br /> .7Im. C G/ 104, <br /> BUSINESS SITE ADDRESSeN <br /> S, A 4 r 1� & K. <br /> ITY <br /> H.EQUIPMENT TESTING AND PRE NTF✓E MAINTENANCE <br /> Testing,preventive maintenance,and calibalion of monitoring equipment(e.g,sensors,probes,line leak detectors,etc.)must be performed al the frequency <br /> specified by the equipment manufacturers instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634,2638 2641) '--- 490-5• <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 690-3b <br /> M.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634 90A <br /> W.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): 49x5 <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING 0f ANNULAR(INTERSTITTAL)SPACES)OR SECONDARY CONTAINMENT <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) 4906 <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM C 49-38 <br /> 69xZ MODEL#: �7 <br /> -PANEL MANUFACTURER Qr !? --- <br /> °90-9' MODEL#(S):- - 9aio <br /> -- <br /> LEAK SENSOR MANUFACTURER: T 490-u <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 4W.13 <br /> 490-12' MODEL#: <br /> PANEL MANUFACTURER: - 490-1s <br /> 690-14' MODEL#(S)• <br /> _ DJ-TANK PROBE MANUFACTURER_ -- 49-31-3 <br /> LEAK TEST FREQUENCY: E] a.CONTINUOUS [01b.DAILYMIGHTLY ❑ c.WEEKLY <br /> - _ 49an <br /> ❑ <br /> e.OTHER(Specify).__________-_____-d.MONTHLY <br /> - __ _ _ - 690-Is <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify); 490-19 <br /> 490-20 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 0-21 <br /> F14.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: Ela.36 HOURS ❑ b.60 HOURS 490-214W22 <br /> 9490-23 <br /> ❑ <br /> 5.TANK <br /> TEST FREQUENCY:O❑ a. <br /> STTANNUALLY NG(23 §23b' ❑BIENNIALLY c.OTHER(Specify): 490-2 <br /> 49x255 <br /> 490.26 <br /> ❑99.OTHER (Specify): 49axr <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHODS)(Check aH that apply) <br /> L CONTINUOUS MONITORING OF PIPE/PIPING SUMPS)AND OTHER SECONDARY CONTAINMENT W[TH AUDIBLE AND <br /> 49086 <br /> SUAL ALARMS. (23 CCR§2636) 490-29 <br /> SECONDARY_CONTAINMENT IS.:t..DRY ❑b.LIQUID FILLED Or.PRESSURIZED Ed.UNDERVACUUM _ _---_ 4�J1 <br /> Oso-3o MODEL ___ _ <br /> PANEL MANUFACTURER_V_ee--e. __ -_- _____ - = .. ^�! 49-3x0 <br /> n esuix MODEL#(S): {Q�U y[Q <br /> _ LEA_K SENSOR MANUFACTURER: (�Q �.f l� { ------- "'"-'- - <br /> 490-34 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN.. ❑a.YES ❑b.NO <br /> 49o-xs <br /> FAH,UREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTO TIC PUMP SHUTDOWN. [Ia.YES ❑b.NO <br /> 2.MECHANICAL LINE LEAK DETECTOR(ML LD)THAT ROUTINELY PERF S 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR2636)-___ -_-____-_--{----_f- ---- °90-38 <br /> :1!&C-1: <br /> 49aat MODEL#(S): r O V <br /> MLLD MANUFACTURER(S): <br /> g.p.h. na on <br /> 490-39 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(FLED)THAT RO NELY�PERFORNYS 3.0 LEAK TESTS (23 CCR§2 4�A1 <br /> aso<0. i MODEL#(S): <br /> ELLD MANUFACTURER(S) 490.42 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ L MINIMUM MONTHLY 0.2 g.p.h. E] 2.MINIMUM ANNUAL 0.1 g.p.h. <br /> YES [Ib.NO °9043 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. 1:1a. 490-04 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑e.YES El b.NO <br /> 4.PU'E INTEGRITY TESTING x90<s 490-0649x47 <br /> TEST FRE UENCY ❑ e.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER S ecif <br /> 49048 S <br /> 5.VISUAL PIPE MONITORING. <br /> FREQUENCY (3a.DAILY C3 b.WEEKLY c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" ago<9 <br /> "Allowed for monuoring ofunbuded e.rpny genmwr fuel Eipinironly W HSC 25281.5 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA l23 CCR§2636(a)(3)l. 49x50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 :, CONNECTED -b THE TANK SYSTEM <br /> 490-51 490-52 <br /> ❑ <br /> 99.OTHER(Specify) ago-53 <br /> r <br /> UPCF UST•D(12/2007)1/4 <br />