My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2019 9:21:46 AM
Creation date
11/2/2018 8:30:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
9/14/2017 6:32:41 PM
QuestysRecordID
3636789
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 � <br /> D. Results of Testing/Servicing <br /> MAR 16 2016 <br /> Software Version Installed: 17.00 <br /> Com fete the follow na checklist: '04TAL <br /> InYes ❑ No' Is the audible alar operational? <br /> ❑ No' Is the visual alar operational? <br /> ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> N N/A <br /> ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A failsto operate, or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) N Sump/Trench <br /> Sensors; ❑Dispenser Containment Sensors. <br /> Did you confr positive shut-down due to leaks and sensor failure/disconnection? N Yes; ❑No. <br /> ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ❑ N/A installed),is the overfill warning alar visible and audible at the tank fill point(s)and operating property? If so,at what percent of tank capacity <br /> does the alar trigger? 90% <br /> N No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> N No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below.❑ No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,ifapplicable <br /> ❑ No' I Is all monitoring equipment operational per manufacturers specifications? <br /> 'In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: All passed STACY ON SITE WITH SJC EH <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.