My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2300 - Underground Storage Tank Program
>
PR0231509
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2019 9:21:46 AM
Creation date
11/2/2018 8:30:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231509
PE
2361
FACILITY_ID
FA0003809
FACILITY_NAME
A G SPANOS AVIATION DEPT*
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\PR0231509\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
9/14/2017 6:32:41 PM
QuestysRecordID
3636789
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging f SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes ❑ No. Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ® Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ® Yes ❑ No' Was accuracy of system product level readings tested? , <br /> ❑ Yes ❑ No" Was accuracy of system water level readings tested? <br /> ® Yes ❑ No' Were all probes reinstalled properly? MAR <br /> E Yes ❑ No' Were all items on the equipment manufacturer's maintenance checkfist completed? A <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. EIRMONMENTIAL HEALTH <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. PERIIAMSER V ICES <br /> Complete the following checklist: <br /> Yes ❑ No" For equipment start-up orannual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: Z 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No' Was the testing apparatus properly calibrated? <br /> Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ® Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> [] N/A <br /> S Yes ❑ No' For electronic LLDs,does the turbine automatically shutoff if any portion of the monitoring system is disabled or disconnected? <br /> ❑ N/A <br /> ® Yes ❑ No` For electronic LLD&,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> Lylml ❑ NIA <br /> y <br /> E] Nu" For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: SITE HAS 2 MECHANCIAL AND 1 ELECTRONIC PLLDS <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.