My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2300 - Underground Storage Tank Program
>
PR0231005
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:34 AM
Creation date
11/2/2018 9:02:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231005
PE
2381
FACILITY_ID
FA0003843
FACILITY_NAME
STKN METRO AIRPORT/KEYLOCK*
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726026
CURRENT_STATUS
02
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\5000\PR0231005\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br />Project Location Stockton Metropolitan Airport, 5000 S. Airport Way, Stockton, CA 95206 <br />Owner County of San Joaquin, Department of Aviatior�hone No. (209)468-4700 <br />Contractor JIM THORPE OIL, INC. Phone No. (209)368-6175 License No.495699 <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />_ 1. Submission of Soll Engineer's Compaction Report within 30 days of project completion, or <br />X 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br />was placed In the excavation In 12" lifts: <br />X A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch In diameter <br />B. Crushed rock--self-compacting material not more than drree-quarters (3/4) inch In cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Sol[ Engineer's Compaction Report will be submitted within 30 days of roject completion, or submission <br />of verification that the select material described above will be placed at a minimum of five (5� cubic yards per 1000 gallon lank <br />displacement and that the entire excavation will be backfilled and compacted to Insure compliance with the Uniform Building <br />Code Appendix Chapter 70. <br />• JIM THORPE OIL,INC. <br />Name(Print) <br />s •� <br />• Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.