My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2300 - Underground Storage Tank Program
>
PR0503497
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 4:12:44 PM
Creation date
11/2/2018 9:05:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0503497
PE
2381
FACILITY_ID
FA0005867
FACILITY_NAME
STOCKTON METRO AIRPORT*
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\5000\PR0503497\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/29/2011 8:00:00 AM
QuestysRecordID
94633
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNI WATER RESOURCES CONTR(" BOARD <br /> FORM 'B': UNDLrRGROUND STORAGE TANK PROrt;RAM m� <br /> TANK TANK PERMIT APPLICATION INFORMATION <br /> COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACH TANK. - '47 <br /> 10 <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION [V-] 7 ERMANENTLY CL E K <br /> ONE ITEM F-12INTERIM PERMIT F-] 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ANK REMOVED <br /> FACILITY/S(TE NAME WHERE TANK IS INSTALLED: SOOO /4-I0 ,i FARM TANK-YES❑ NO CAD <br /> CJI) <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN-SO SPECIFY Ha <br /> A. OWNERS TANK ID# I B. MANUFACTURED BY: <br /> C. YEAR INSTALLED D. TANK CAPACITY IN GALLONS <br /> 11. TAN CONTENTS IF(A.1),IS MARKED,COMPLETE ITEM C.IF(A.1),IS NOT MARKED,COMPLETE ITEM D. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 2 PETROLEUMC. 1�11 UNLEADED [:] 2 LEADED ❑3 DIESEL <br /> 8. <br /> ❑3 CHEMICAL PRODUCT ❑ 4 OIL 1 PRODUCT ❑ 4 GASAHOL ❑5 JET FUEL ❑ 6 AVIATION GAS <br /> ❑ 5 HAZARDOUS ❑ 80 EMPTY ❑95 UNKNOWN ❑2 WASTE ❑ 7 METHANOL ❑99 OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF ^ <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.# C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOX A,B,C,&D <br /> A.TYPE OF ❑ DOUBLE WALLED ❑ 3 SINGLE WALLED WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM e2 SINGLE WALLED ❑4 SECONDARY CONTAINMENT ❑99 OTHER <br /> EITI STEELIIRON ❑2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANK ❑5 CONCRETE ❑6 POLYVINYLCHLORIDE ❑ 7 ALUMINUM ❑B 106%METHANOL COMPATIBLEFRP <br /> MATERIAL <br /> ❑9 BRONZE ❑ 10 GALVANIZED STEEL ❑95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBERUNED ❑2 ALKYO LINING ❑3 EPDXY LINING ❑ 4 P NOLICUNING <br /> C. INTERIOR <br /> LINING F-] 5 GLASS LINING ❑6 UNLINED UNKNOWN <br /> ❑ IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL? ❑YES ❑ NO ❑99 OTHER <br /> D. CORROSION ❑ 1 POLYETHLENE WRAP ❑2 TAR OR ASPHALT ❑3 LWRAP ❑4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION [:] 5 CATHODIC PROTECTION E-]91 NONE UNKNOWN ❑ 99 OTHER <br /> IV. PIPING INFORMATION CIRCLE IF ABOVE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> I <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 91 NONE A 95 UNKNOWN A U 99 OTHER <br /> S. CONSTRUCTION A U 1 SINGLE WALLED A U 2 DOUBLE WALLED A U 3 LINED TRENCH A U 91 NONE A&95 UNKNOWN A U 99 OTHER <br /> A U 1 STEEL/IRON A U 2 STAINLESSSTEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASSPIPE A U 91 NONE <br /> C. MATERIAL A U 5 ALUMINUM A 8 CONCRETE A U 7 STEELCLADW/FRP A U 8100%METHANOLCOMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL A U 5 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> I S 1 VISUAL CHECK S 2 INVENTOM RECONCILIATION P 8 3 VADOSE WELLS P 8 4 ELECTRONIC MONITOR P 8 5 GROUNDWATER MONITORING WELLS <br /> NP 8 6 PHECISION TESTING P S ] PRESSURE TESTING P S 91 NONE P 8 95 UNKNOWN P S 99 OTHER <br /> VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> 1.ESTIMATED DATE LAST USED(MO/YR) 2. ESTIMATED QUANTITY OF 1 3. WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING IN GALLONSINERT MATERIAL? E]YES [:] NO <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT. <br /> APPLICANTS NAME(PRINTED 8 SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY <br /> COUNTY# JURISDICTION# AGENCY# FACILITY ID# TANK ID# <br /> ® = = 10 1 c' I 1 0a i <br /> CURRENT LOCAL AGENCY FACILITY ID p APPROVED BY NAME PHONE#WITH AREA CODE <br /> If PERMIT NUMBER PERMIT APPRO AL DATE PERMIT EXPIRATION DATE <br /> L <br /> K# PERMIT AMOUNT SURCHARGE AMT. FEE CODE RECEIPT# BC <br /> FORM B(B-29-88) THIS FORM MUST BE ACCOMPANIED BY A FACILITY/SITE APPLICATION, FORM 'A',UNLESS RRENT FORMA' KAS BEEN FILED <br /> DATA PROCESSING COPY _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.