Laserfiche WebLink
S W RCB.January 2002 <br /> Page 3 of 7 <br /> Job; - . Estes Trucking <br /> 7611 S.Airport Way <br /> Stockton,CA 95206 <br /> Date: May 7,2007 <br /> 5. SECONDARY PIPE TESTING <br /> 1 Test Method Developed By: _ [ ]Piping Manufacturer [X]Industry Standard [ ]Professional <br /> Engineer <br /> [ ]Other(Specify) <br /> 'fest Method Used: [X]Pressure [ ] Vacuum [ ]Hydrostatic <br /> L ] Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0.20 <br /> Piping Run 41 Piping Run Piping Run Piping Rum Piping Run <br /> Piping MateriaC Fiberglass <br /> Pipige Manufacturer: A.O. Smith <br /> Pi Ing Diameter: 3" and 2" <br /> Length of Piping Run: 12 ft. <br /> Product Stored: Diesel <br /> Method and location of 3 x 2 Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5—Minutes <br /> —starting test: <br /> Test Start Time: 8:15 A.M. <br /> Initial Reading R1) 5 P.S.I. <br /> Test End Time: 9:15 A. M. 1 <br /> final Reading(RQ: 5 P.S.I. _! <br /> . Test Duration: I HOUR <br /> Change in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or -0- <br /> Criteria: <br /> Test Result: [XI Pass[ I Fail [ [ Pass [ [Fail [ [ Pass [ ] Fail [ I Pass [ ] [ ]Pass [ I Fait <br /> Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />