My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7759
>
2300 - Underground Storage Tank Program
>
PR0231798
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:35 AM
Creation date
11/2/2018 9:22:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0231798
PE
2361
FACILITY_ID
FA0003766
FACILITY_NAME
SJ CO MOSQUITO & VECTOR CTRL*
STREET_NUMBER
7759
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705007
CURRENT_STATUS
02
SITE_LOCATION
7759 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7759\PR0231798\REMOVAL PLAN 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CKFILL EXCAVATION CERTMCATE <br />projca Location 7759 South Airport Way Stockton CA 95206 <br />CwnerSan Joaquin County Mosquito & Vector Control DistriZaone No. 209-982-4675 <br />ContractorRamcon Eng & Env Cont, Inc. phoneNo, 916-372-7535 License No. 510034 <br />INDICATE rifETHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of pmject completion: or <br />2. Submission of veziEcation, e.$ load ricket, within 30 days of project completion that one of the following materials was <br />placed is the excavation is l2 lifts: <br />A. Pea gravel --smooth. rounded material not more than =-half (IM inch in diameter <br />S. Cmhed tock -self -compacting material not more than three -quartets (;I4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the backfill material and tanimipipes made of poly resin glass or similar mar MLS ) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofp�.ec completion, or submission of <br />verification that the select maretial described above will be placed at a minimmu of nve (5) cubic yards per 1000 gallon tunic <br />displacement and that the enure excavation will be bacidilled and compaced to insure compliance with the Uniform Building Code <br />Appendix Chapter 10. <br />+' Barry E. Edmiston <br />t ane ( r) <br />' <br />Administrative <br />rgnature <br />" Shall be the responsible managing employee on the license or auhormed agern. <br />
The URL can be used to link to this page
Your browser does not support the video tag.