My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7759
>
2300 - Underground Storage Tank Program
>
PR0231798
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:35 AM
Creation date
11/2/2018 9:22:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0231798
PE
2361
FACILITY_ID
FA0003766
FACILITY_NAME
SJ CO MOSQUITO & VECTOR CTRL*
STREET_NUMBER
7759
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705007
CURRENT_STATUS
02
SITE_LOCATION
7759 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7759\PR0231798\REMOVAL PLAN 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY BRIEFINGS <br />1. Inform each employee of what work needs to be accomplished during the work day. <br />2. Review any problems that may have occurred the prior day. <br />3. Inform employees on the status of air quality. Review respirator donning procedure <br />if applicable. <br />4. Inform employees on visitors to site that day. <br />5. Review weather conditions and what signs to watch our for. If weather is going to <br />be abnormal, take necessary breaks. <br />6. Reiterate the fact, that safety comes first. <br />7. Have open discussion with employees to answer any questions or problems. <br />AIR AND PERSONAL MONITORING DEVISES <br />We will be using the Gastechtor 1314 and the LEL 02 Meter to monitor the concentrations <br />of hydrocarbons & explosive mixture in the air and in the dirt. The Gastechtor is calibrated <br />weekly with Hexane. <br />PERSONNEL PROTECTIVE EQUIPMENT <br />Employees will work at Level D until air monitoring indicates a need for a change. Level D <br />protection will consists of hard hats, steel toed boots, ear and eye protection and normal <br />work clothes (Blue jeans and company shirts). When air monitoring indicates TPH levels <br />above 50 PPM or Benzene levels above 1 PPM respirators will be donned along with <br />Tyvek suits and gloves. Filter cartridge will be changed when break through is achieved. <br />At Level C air monitoring will be changed from every 15 minutes to every 5 minutes. When <br />employees reach immediate break through on filter cartridge then the site will be <br />evacuated. <br />SECURING THE SITE <br />Securing the site will consist of barricading the excavation with lighted barricades and <br />barricade tape. All stockpiled soil will be covered with visqueen. The visqueen will be <br />secured with tires and rope to hold it in place. <br />
The URL can be used to link to this page
Your browser does not support the video tag.