My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALEXANDRIA
>
6803
>
2300 - Underground Storage Tank Program
>
PR0231519
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:36 AM
Creation date
11/2/2018 9:26:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0231519
PE
2381
FACILITY_ID
FA0004026
FACILITY_NAME
SWENSON PARK GOLF COURSE
STREET_NUMBER
6803
STREET_NAME
ALEXANDRIA
STREET_TYPE
PL
City
STOCKTON
Zip
95207
APN
09711024
CURRENT_STATUS
02
SITE_LOCATION
6803 ALEXANDRIA PL
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALEXANDRIA\6803\PR0231519\REMOVAL 1994.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br />The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br />representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br />contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted <br />within five (5) working days pursuant to California Health & Safety Code, Section 25295. <br />WATER NOT PRESENT IN THE TANK PIT <br />TANK <br /># <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION OF SOIL SAMPLES <br />TANK & PIPING STOCKPILE SAMPLES <br />< 1,000 <br />1 per Tank <br />Fill OR Pump End of Tank <br />® <br />1,000 - 10,000 <br />2 per Tank <br />1 at each End of Tank <br />2 <br />> 10,000 <br />3 or More <br />per Tank <br />Ends and Middle OR generally <br />spaced along the length of the Tank <br />PIPING AND STOCKPILE <br />WATER IS PRESENT IN TANK PIT <br />TANK <br /># <br />PIPING SOIL SAMPLES <br />1Sample every 20 lineal feet <br />V 11 <br />TANK & PIPING STOCKPILE SAMPLES <br />2 Samples every 50 cubic yards <br />WATER IS PRESENT IN TANK PIT <br />TANK <br /># <br />I TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION of SOIL <br />SAMPLES <br />MINIMUM NUMBER of <br />WATER SAMPLES <br />< 1,000 <br />< 10,000 <br />Center and Ends OR Sides of Tank <br />From wall next to tank <br />1,000 - 10,000 <br />5 per Tank <br />Single Tank <br />2 <br />ends at soil/ groundwater <br />1 <br />Ends and Middle and generally spaced along <br />the length of the Tank <br />interface <br />> 10,000 OR <br />From wall next to tank <br />Tank Cluster <br />4 <br />ends at soil <br />1 <br />groundwater interface <br />SLAB PRESENT IN THE TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in <br />order to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br />TANK <br /># <br />TANK SIZE <br />(Gallons) <br />MINIMUM NUMBER <br />of SOIL SAMPLES <br />LOCATION of SOIL SAMPLES <br />< 1,000 <br />3 per Tank <br />Center and Ends OR Sides of Tank <br />1,000 - 10,000 <br />5 per Tank <br />Center and Ends OR Sides of Tank <br />> 10,000 <br />5 OR More per Tank <br />Ends and Middle and generally spaced along <br />the length of the Tank <br />EH 23 047 (Revised 7/10/92) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.