Laserfiche WebLink
1 . 1 . <br /> 8. a. Describe the method that will be utilized to purge and/or inl�L3S ert the tank's): <br /> /l✓/ /G� <br /> b. Tank/Piping <br /> HaHauler: <br /> Name !O/ ,II�rL <br /> Address 77 f CyG /`DSC/�f City Z a d ! Zip Sf'�A <br /> Phone No.( ZV ) 3 2- '/ <br /> Hauler Registration#(if hauled as hazardous) l.4. 't30 3 <br /> C. Tank/Piping Disposal Site: <br /> Name N <br /> Address /2-ace) A'ULGS6/�? QLV City&Vay Cd C ziv 7Z 75YZ— <br /> Phone No.(—J�6 ) <br /> EPA ID#(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YES,X NO [] <br /> 9a. Describe,in detail how the soil and/or water sample(s)beneath the tank and piping will be obtained: <br /> �s�c�el 22745,��s-€ 4 mss s r v� e��tryi <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> RZ''f s-41d-F40"' <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? <br /> 5 Aa- riff lv BE- f v i e5 c— <br /> c)Contaminated Soil Hazardous Waste Hauler: <br /> Name J/i77 �/S�O/C�� /�,/. C. Hauler Registration# Z746 <br /> Address 77 £i GO��f/`�1i, S7 City Gy�� zip--5' 5 z <br /> Phone No. ( Z 0 L <br /> EH 23 046(Revisedl0/16/03) Page 5 <br />