Laserfiche WebLink
4' <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location: Zek <br /> Owner: Phone No: <br /> Contractor: .���'/ /�Od�E Q/L Phone No: 3V"jP,6I7Jt License No: <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> _ 2. Submission of verification, e.g.: load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> 1 A. Pea gravel—smooth,rounded material not more than one-half(1/2)inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of roject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five ( cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> JFFF�f�I /CiiZI 7- <br /> Name mt <br /> + Gi � <br /> rte not <br /> r tore <br /> " Shall be the responsible managing employee on the license or authorized agent. <br /> EH 23 046 (Revised 10/16/03) Page 11 <br />