My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALMOND
>
265
>
2300 - Underground Storage Tank Program
>
PR0522539
>
REMOVAL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:37 AM
Creation date
11/2/2018 9:27:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2004
RECORD_ID
PR0522539
PE
2381
FACILITY_ID
FA0015354
FACILITY_NAME
ALMOND NORTH LLC
STREET_NUMBER
265
Direction
E
STREET_NAME
ALMOND
STREET_TYPE
DR
City
WOODBRIDGE
Zip
95258
APN
06206014
CURRENT_STATUS
02
SITE_LOCATION
265 E ALMOND DR
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALMOND\265\PR0522539\REMOVAL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4' <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location: Zek <br /> Owner: Phone No: <br /> Contractor: .���'/ /�Od�E Q/L Phone No: 3V"jP,6I7Jt License No: <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> _ 2. Submission of verification, e.g.: load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> 1 A. Pea gravel—smooth,rounded material not more than one-half(1/2)inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of roject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five ( cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> JFFF�f�I /CiiZI 7- <br /> Name mt <br /> + Gi � <br /> rte not <br /> r tore <br /> " Shall be the responsible managing employee on the license or authorized agent. <br /> EH 23 046 (Revised 10/16/03) Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.