Laserfiche WebLink
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert(tank's bottom) at a collection depth not to exceed 2 -4 feet. If contamination <br /> is documented during closure, an Unauthorized Release Notification must be completed and submitted within five (5)working days <br /> pursuant to California Health& a eS f ty CbII✓�Sectton f3f3. ---� <br /> WATEJ(;;�RESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> N (Gallons) of SOIL SAMPLES <br /> 1 < 1,000 1 er Tank Fill OR Pum End of Tank <br /> 1,000- 10,000 2 per Tank 1 at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> 1 TANK& PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER <br /> k (Gallons) of SOIL SAMPLES SAMPLES of WATER SAMPLES <br /> < 10,000 2 from wall net to tank <br /> Single Tank 3 4ends at soil/groundwater 1 <br /> interface& I below tank <br /> 4 from wall next to tank <br /> > 10,000 OR ends at soil/groundwater <br /> Tank Cluster 5 or more interface& 1 below each l <br /> tank <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to . <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> N (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000- 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced <br /> along the length of the Tank <br /> EH 23 046(Revised 08/13/99) Page 7 <br />