Laserfiche WebLink
r. <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name USPS/Veh i cl a Ma i ntenance Fac i 1 i ty <br /> Facility Address 3131 Arch/Airport Rd. , Stockton, CA 95213-9890 <br /> A Describe the frequency of performing the monitoring: <br /> Tank Daily - Continous monitoring of our Monitoring Svstem. <br /> Piping Annual certification of Panel and Probes/Annual Tightness Test of <br /> Piping/Annual certification test of line 1pak Dererror_ <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank Pollulert Fluid Detection System/Model #FD103 <br /> Piping Red Jacket of Line leak Detector An 1 I r r by cr�ro <br /> approved method. <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> Pollulert Sensor Station <br /> (See Attachment #2 Site Plan) <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> Pat Scholzen Mgr. , Vehicle Maintenance Facility <br /> Lee Rude Administrative Clerk <br /> John Trede Storekeeper <br /> E. Reporting format for monitoring: <br /> Tank Record findings in daily log <br /> Piping II 11 " 11 <br /> II <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but notless than every 12 months: Annually in conjuction with our "Line Test." <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: Bi-Annual familiarization with Pollulert <br /> Control Center and review of the "Instruction Manual ." <br />