My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARCH AIRPORT
>
3131
>
2300 - Underground Storage Tank Program
>
PR0231514
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:42:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231514
PE
2381
FACILITY_ID
FA0003818
FACILITY_NAME
U S POSTAL SERVICE-VEHICLE MAINT
STREET_NUMBER
3131
STREET_NAME
ARCH AIRPORT
STREET_TYPE
RD
City
Stockton
Zip
95213
APN
17927009
CURRENT_STATUS
02
SITE_LOCATION
3131 ARCH AIRPORT RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARCH AIRPORT\3131\PR0231514\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 II _ACKFILL EXCAVATION CERTIFICATE <br /> Project Location 3\31t c h 1t Rio 2 C" M1 Odd+•J�Gc K�b cti�\n <br /> Owner U9 S Phone No._2 <br /> Contractor (4MCO t1 2A4 IfKC . Phone No. (a- 3`k Z-71S3� LiceaSe No. S f 3 <br /> INDICATE METHOD of BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion:or <br /> V 2I Submission of verification, e. load ricket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in l2$lifts: <br /> A. pea gravei--smooth, romded material not more than one-half(SM- inch in diameter <br /> B_ Crashed tock—seifcompacting material not more than three-quarters (;/4) inch in cross secrional <br /> measurr 11L 1c. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and taitks/pipes made of poly Min glass of similar materials_) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material desrnbed above will be placed at a minimum of five (S� cubic yards per 1000 gallon ;air <br /> dispiacemem and that the cut re excavation will be backfilled and compared to asure comPliaace with the Uniform Buildiag Code <br /> Appendix Chapter 70. <br /> Oak <br /> c ( tint <br /> Ra JCS Ssis eIj <br /> e <br /> e <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.