My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARCH AIRPORT
>
3131
>
2300 - Underground Storage Tank Program
>
PR0231514
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:42:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231514
PE
2381
FACILITY_ID
FA0003818
FACILITY_NAME
U S POSTAL SERVICE-VEHICLE MAINT
STREET_NUMBER
3131
STREET_NAME
ARCH AIRPORT
STREET_TYPE
RD
City
Stockton
Zip
95213
APN
17927009
CURRENT_STATUS
02
SITE_LOCATION
3131 ARCH AIRPORT RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARCH AIRPORT\3131\PR0231514\REMOVAL 1999.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I CICFILL EXCAVATION CERTIFICATE <br /> Project Locanon <br /> Owmcr US?S Phone No.__q t 6Z— <br /> Cont actor It-Q MCO K phone No. (O-3�l Z L cease NO. S I 3 <br /> INDICATE MEI'IiOD OF BACIMLL QQAI-ITY ASSURANCE <br /> _ 1. Submission of Soil Zrgjneer's Contnaicdon Report within 30 days of pmj=eompledoa. or <br /> ✓2. Submission of vcffxxd= a f., load ricket. within 30 days of project compaction mat One of the following materials was <br /> placed ' they tcazua.m 12 lifts: <br /> A. pea gravel-smooth, rounded material not more map ono-half(IM imh is dmmetc: <br /> B. Cr¢shel ick-seif�ompacting tttarttial twt more than three-quarters (;/4) inc ip mss erw: -n <br /> measotemeat. (Use of crushed rockwjU��of <br /> be permitted mor similar materials )wt11 be made bet vr" <br /> r backfill if Contact <br /> the backfll material and taWmlpipes poly <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Repots will be submitted within 30 days of PM"ect completion. or submission c' <br /> verification mat the select material described above will be placed at a =in m„ of nue (5) tabic yards per 1000 gallon :W.:: <br /> dispiac-emeat and ihaz the entire ---cavadon will be backfilled and compared m =sure compliance with rhe Uniform Buildin4 Cx_ <br /> Appendix Chapter 70. <br /> Ss I s a <br /> � "el <br /> w <br /> ' Shall be the responsible managmg employee on the license or audwr=d agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.