Laserfiche WebLink
1 \" <br /> Site Personnel <br /> _ Project Manager: Dave Jones, Operations Manager <br /> Project Engineer: Gary H. Hall, P.E. <br /> Site Foreman: Mark Jeglie <br /> Subcontractor Representatives: Various - Will be logged at daily tail gate meetings. <br /> Possible Chemical Contaminant <br /> Anticipated <br /> Contaminant Medium Concentrations <br /> Diesel Soil Unknown <br /> Gasoline Soil Unknown <br /> Benzene Soil Unknown <br /> Toluene Soil Unknown <br /> Ethylbenzene Soil Unknown <br /> Xylenes Soil Unknown <br /> Physical Hazards <br /> Proceduresto <br /> Hazard Reduce Hazard <br /> Heavy Equipment Be alert and aware of what is going on at all times. <br /> Wear proper safety equipment (hard hat, steel toe <br /> boots). <br /> Material Handling Use proper lifting procedures. Know what type of <br /> material is being handled. <br /> Noise Use adequate ear plugs. <br /> Pedestrian Traffic Keep area fenced and use caution signs. <br /> Required Health and Safety Equipment <br /> o hard hat <br /> _ o steel toe boots <br /> o respirator that fits (with organic vapor cartridge) <br /> o gloves <br /> o protective eye wear <br /> o protective clothing <br /> o ear plugs <br /> o PID or TLV meter <br /> o First aid kit <br /> 0 Air monitors <br />