My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1819
>
2300 - Underground Storage Tank Program
>
PR0232020
>
REMOVAL REMOVAL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:45:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 2003
RECORD_ID
PR0232020
PE
2361
FACILITY_ID
FA0003767
FACILITY_NAME
JOHN TAYLOR FERTILIZER*
STREET_NUMBER
1819
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320008
CURRENT_STATUS
02
SITE_LOCATION
1819 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARGONAUT\1819\PR0232020\REMOVAL 2003.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 1819 South Argonaut, Stockton,CA <br /> pyncrJohn Taylor Fertilizer (Stockton Facility) Phone No.916-991-9813 <br /> ContractorRamcon Eng. Phone No.916-375-7535 License No.510034 A Haz <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> X 2. Submission of verification, e.� load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12 lifts: <br /> X A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more [hart three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be trade between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> *Rollo Stephens <br /> Name t <br /> *Operation Tanager <br /> ie t <br /> * Stgrifaire <br /> ' Shall be the responsible managing employee on the license or authorized agent. <br /> I <br /> i <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.