My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ASHLEY
>
7644
>
2300 - Underground Storage Tank Program
>
PR0231872
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 4:26:58 PM
Creation date
11/2/2018 9:46:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231872
PE
2361
FACILITY_ID
FA0003967
FACILITY_NAME
AT&T California - UE132
STREET_NUMBER
7644
Direction
N
STREET_NAME
ASHLEY
STREET_TYPE
Ln
City
Stockton
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
7644 N Ashley Ln
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ASHLEY\7644\PR0231872\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
5/9/2014 6:23:21 PM
QuestysRecordID
94446
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Edition:June 1999 <br /> Veeder-Root <br /> TTS-200/200U250/250i/300/300c/300i/300pc/350/350pc/350r/350rpc UST ATGS <br /> (8473 Digital Sensing Magnetostrictive Probe) <br /> AUTOMATIC TANK GAUGING SYSTEM <br /> Certification: Leak rate of 0.2 gph with Po=99%and PFA=0.1%. <br /> Leak Threshold: 0.093 gph.A system should not be declared tight if the test result indicates a loss or <br /> gain that equals or exceeds this threshold. <br /> Applicability: Gasoline,diesel,aviation fuel,and solvents. _ <br /> Tank Capacity: Maximum of 15,000 gallons. <br /> Tank must be between 50 and 95%full. <br /> Waiting Time: Minimum of 8 hours, 18 minutes between delivery and testing. <br /> Minimum of 30 minutes between dispensing and testing. <br /> There must be no delivery during waiting time. <br /> Test Period: Minimum of 2 hours. <br /> Test data are acquired and recorded by the system's computer. <br /> Leak rate is calculated from the difference between the first and last data collected. <br /> There must be no dispensing during test. <br /> Temperature: Average for product is determined by a minimum of 5 thermistors. <br /> Water Sensor: Must be used to detect water ingress. <br /> Minimum detectable water level in the tank is 0.544 inch. <br /> Minimum detectable change in water level is 0.027 inch. <br /> Calibration: Thermistors and probe must be checked and calibrated in accordance with <br /> manufacturer's instructions. <br /> Comments: Not evaluated using manifold tank systems. <br /> Tests only portion of tank containing product. <br /> As product level is lowered,leak rate in a leaking tank decreases(due to <br /> lower head pressure). Consistent testing at low levels could allow a leak to remain <br /> undetected. <br /> EPA leak detection regulations require testing of the portion of the tank system which <br /> routinely contains product. <br /> California regulations require at least one test per month after <br /> routine product delivery or when the tank is filled to within 10% of <br /> the highest operating level during the previous month. <br /> Veeder-Root Evaluator: Midwest Research Institute <br /> 125 Powder Forest Dr. Tel: (816)753-7600 <br /> Simsbury,CT 06070-2003 <br /> Tel: (860) 651-2700 Date of Evaluation: 05/14/93 <br /> Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the perfomtance of the <br /> method or equipment. Equipment should be installed and operated in accordance with all applicable laws and regulations. <br /> 314 <br />
The URL can be used to link to this page
Your browser does not support the video tag.