My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AURORA
>
1035
>
2300 - Underground Storage Tank Program
>
PR0231242
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:46 AM
Creation date
11/2/2018 9:49:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0231242
PE
2381
FACILITY_ID
FA0004060
FACILITY_NAME
VETTER PLUMBING COMPANY INC
STREET_NUMBER
1035
Direction
S
STREET_NAME
AURORA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14732018
CURRENT_STATUS
02
SITE_LOCATION
1035 S AURORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AURORA\1035\PR0231242\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SAMPLINtePROTOCOL FOR ROUTINE TANK REI�I!OVALS <br /> The following represents ndnimum sampling criterion required for closure compliance. Soil sampics collected shall be <br /> teptesentative of native soils beneath the tank's Invert(tank's bo(tom) at a collection depth not to exceed 2 - 4 feet. If <br /> contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted <br /> within five (5) working days pursuant to California Health & Safety Code, Section 25295. <br /> WATER NOT PI(ESENT IN TIIE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> (Gallons) of SOIL SAMPLES <br /> \ < 1,0W I per Tank Fill OR Pump End of Tank <br /> I'm) - 10,000 2 per Tank 1 at each End of Tank <br /> > 10,001) 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES I I Sample every 20 lineal feet <br /> TANK & PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER of <br /> >Y (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < f0,(") From wall next to tank <br /> Single Tank 2 en& at soil/ groundwater 1 <br /> Interface <br /> > 10,(X10 OR From wall next to lank <br /> Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRFSEN'1' IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required In <br /> order to collect the samples. (Physical removal of the obstruction wlll allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES. <br /> # (0011ons) of SOIL SAMPLES I —i <br /> < 1,(11X) 3 per Tank Center and Ends OR Sides of Tank <br /> I ' <br /> 1,(1(1) - 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > I0,0W 5 OR More Per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> Ell 21 017 (Revised 7/10/92) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.