My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
14600
>
2300 - Underground Storage Tank Program
>
PR0506780
>
REMOVAL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:47 AM
Creation date
11/2/2018 9:54:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1997
RECORD_ID
PR0506780
PE
2381
FACILITY_ID
FA0000953
FACILITY_NAME
MUSD-NEW HAVEN SCHOOL
STREET_NUMBER
14600
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20610005
CURRENT_STATUS
02
SITE_LOCATION
14600 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\14600\PR0506780\REMOVAL 1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1/ BACKFILL EXCAVATION CERTIFICATE <br /> Project Location -(Ll b C'O /7 � <br /> . c �/V 4 W 4 M t CA <br /> Owner. P4,Vl�CC1 l (7aii l �j( t-L , Phone No� <br /> Contractor SI21CO Phone No. (209) 524-9653 License No. 449864 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion,or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> A. Pea gravel—smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> V'11 <br /> ame t <br /> I [ <br /> gnature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.