My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
14600
>
2300 - Underground Storage Tank Program
>
PR0506780
>
REMOVAL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:47 AM
Creation date
11/2/2018 9:54:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1997
RECORD_ID
PR0506780
PE
2381
FACILITY_ID
FA0000953
FACILITY_NAME
MUSD-NEW HAVEN SCHOOL
STREET_NUMBER
14600
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20610005
CURRENT_STATUS
02
SITE_LOCATION
14600 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\14600\PR0506780\REMOVAL 1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0. PERSONNEL: <br /> 5.1. Project Manager <br /> -Manages field operations. <br /> - Ensures the Work Plan is completed on schedule. <br /> -Briefs the field teams on their specific assignments. <br /> -Participates in the preparation of the Site Safety Plan. <br /> - Serves as a liaison with public officials. <br /> 5.2. Site Safety Officer <br /> - Implements and enforces the SSP. <br /> - Assures that all on-site personnel have received a copy of the SSP, have <br /> read it, and understand it. <br /> - Conducts frequent inspections of site conditions, facilities, equipment, <br /> and activities to determine if the SSP is adequate and being followed. <br /> - Conducts daily "tailgate" meetings to explain the plan of work for the <br /> day, mention potential hazards of the site. <br /> - Ensures that protective clothing and equipment are properly stored and <br /> maintained. Knows emergency procedures, excavations routes, and <br /> notifies local emergency services when necessary. <br /> -Notifies the health and Safety Manager of all accidents and injuries that <br /> occur on site. <br /> 5.3. On-Site Personnel <br /> - Are required to document their full understanding of the SSP before <br /> starting work by signing that they have read the SSP and understand it. <br /> - Complies with the SSP. <br /> -Notifies the SSO of unsafe conditions. <br /> page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.