My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2300 - Underground Storage Tank Program
>
PR0231557
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 11:08:07 AM
Creation date
11/4/2018 2:11:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231557
PE
2381
FACILITY_ID
FA0003930
FACILITY_NAME
KING ISLAND MARINA
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
02
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\11530\PR0231557\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/27/2012 8:00:00 AM
QuestysRecordID
86112
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0n ' <br /> STATE OF CALIFORNIA � 11 <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B , t <br /> �wt�n Ow M.1 <br /> COMPLETE A SEPARATE FORM FOR,,JEACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ B TANK REMOVED <br /> -TO led <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# 2 B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) L D. TANK CAPACITY IN GALLONS: <br /> ILTANK96NTENTS IFAAISMARKED,COMPLETE ITEM C. <br /> A / MOTOR VEHICLE FUEL ❑ 4 OIL S. C. to REGULARn 3 DIESEL ❑ 6 AVIATION GAS <br /> UNLEADED hL�JI 4 GASAHOL <br /> 2 PETROLEUM ❑ 60 EMPTY 1 PRODUCT ❑ 1b PREMIU D ❑ 5 JET FUEL ❑ 7 METHANOL <br /> UNLEAD❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED 4 L , q Z C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ DOUBLE WALL F-13 SINGLE WALL WITH EXTERIOR LINER E::] 95 UNKNOWN <br /> SYSTEM 2SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK LV <br /> 1 BARE STEEL ❑ 2 STAINLESS STEEL F-] 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ B 100% METHANOL COMPATIBLE W/FRP <br /> (PdmwyTw*) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ I RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNO N ❑ 99 OTHER <br /> LINING 11 <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NO iPX Py/ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION [1] 5 CATHODIC PROTECTION V91 NONE E::]95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE AIFABOVEGROUN UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION ACU / SINGLE WA A DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A 1U i BARE STE A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 6 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZEDSTEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEA DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 M09RTITIA ❑ a9 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING [_] 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN 99 OTHER12, <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED A SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# �� <br /> STATE LDA <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br /> FORM B (12-91) I/T ^ ,(1/,L FORDma9116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.