My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2300 - Underground Storage Tank Program
>
PR0231557
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:34 PM
Creation date
11/4/2018 2:12:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231557
PE
2381
FACILITY_ID
FA0003930
FACILITY_NAME
KING ISLAND MARINA
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
02
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\11530\PR0231557\REMOVAL 1999 TANKS 2 & 3.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLIIWPROTOCOL FOR ROUTINE TANK REMOVT S <br /> Pcoin <br /> dowing represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> entative of native soils beneath the tank's invert(tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br /> inationis documented during closure, an Unauthorized Release Notification must be completed acrd submitted within five (5) <br /> g days pursuant to California Health&Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NU v1BER LOCATION OF SOIL SAMPLES <br /> q (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> .I 1,000 - 10,000 2 per Tank 1 at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPLNG AND STOCKPILE <br /> I <br /> a�3 PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> TANK& PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER of <br /> 4 (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> < 10,000 From wall next to tank <br /> Single Tank 2 ends at soil/ groundwater t <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 3 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samplesltall be obtained beneath the stab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOI.SAMPLES <br /> X (Gallons) of SOIL SAMPLES <br /> < 1,000 3 ocr Tank Center and Ends OR Sides of Tank <br /> 1,000 - 10,000 5 per Tank Center and Ends OR Sides of Tattle <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> EH 23 046 (Revised 10/19/98) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.