My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2300 - Underground Storage Tank Program
>
PR0231557
>
REMOVAL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:34 PM
Creation date
11/4/2018 2:12:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231557
PE
2381
FACILITY_ID
FA0003930
FACILITY_NAME
KING ISLAND MARINA
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
02
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\11530\PR0231557\REMOVAL 1999 TANKS 2 & 3.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T 'KFILL EXCAVATION CERTIFICATE <br /> Project Location KIQZ .156--4 Pvsaet <br /> r.+e.r �, Phone No. t� 8 <br /> o9) 4Sr -7cp <br /> Owner P•5. S <br /> Contractor P:1e Phone NO.Cq'43 G88 596" License No. 73[.787 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> X 2. Submission of verification, e.fload ticket, within 30 days of project completion that One of the following materials was <br /> placed in the excavation in 12 lifts: <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> _ B. Crushed rock-self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> the <br /> measurement. <br /> and tanks/pipes made of poly Use of crushed rock will not be rcs�gl�azsfor <br /> or similar materials.)ll if contact will be made between <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Repoli will be submitted within 30 da s of pproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> La• ('oto t� ft. <br /> ame rm[ <br /> r <br /> ue trimu <br /> ---signature <br /> " Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.