Laserfiche WebLink
5.0 Health and Safety Plan Approvals and Acknowledgement <br /> 5.1 Approvals <br /> I have read and approved this HSP with respect to project hazards, regulatory requirements, and <br /> Shaw procedures. <br /> Project Name: SBC Pacific Bell <br /> Sydneyfeels Date <br /> Project Manager a <br /> wI6�1 <br /> p ]l��b'oz <br /> Barb a Marks, CIH#5776 ate <br /> Project Certified Industrial Hygienist <br /> 5.2 Acknowledgments <br /> I acknowledge receipt of this HSP from the Project Manager, and that it is my responsibility to <br /> explain its contents to all site personnel and cause these requirements to be fully implemented. <br /> Any change in conditions, scope of work, or other change that may affect worker safety requires <br /> me to notify the Project Manager and/or the Site Supervisor/Foreman. <br /> Site Safety Officer: Date: h-26-02 <br /> CNCD:6vuaN USM-"&c 5-1 <br />