Laserfiche WebLink
S, a. Describe the method that will be Utilized to purge andlar Inert the 1:911144 <br /> ri�nrhwttl 6� 1AxrreO wl drLj ict a �2ot4s Ibcooaalla�S <br /> b_ TankMpWg Ranier. <br /> Name N I(+ <br /> Address city ZIP <br /> Phone No } <br /> Hauler RegLehatlau P Of bauled as bmardous) <br /> e TanklPt lag Disposal Site: - <br /> Name <br /> Address city ?gyp <br /> Phone No( ] <br /> RPAID#Vf transported to a permltted TSO facillty) <br /> 9. Is the sampling firm antodepeodent third parry from the contractor? YES[I NO[) <br /> 91. Describe,In detall,how the soli and/or water samples)beneath the tank and piping will be obtalned, <br /> A) <br /> Ia. Describe how the excavation will be backliDed with suitable material upas removal_ <br /> It. HandDagofexcavated soll: N+� <br /> a)What material will be used to Ilno the tank pit and cover the stockp0e? <br /> b)What wW be the final desdoalloo of the excavated stockpile? <br /> e)Contaminated Sol]Hazardous Waste Hauler. <br /> Name Hauler Ha�straaan! <br /> Address City Ydp <br /> Pbone Mo.I } <br /> SH 23 046[Revised W13199) Pages <br /> 1.2/10/02 TUE 09:43 ITX/RX NO 87091 16004 <br />