Laserfiche WebLink
rlr n rLuum <br /> 6. a. Describe the method that will be utilized to puree audlerinert the tattk(s} <br /> 'Twn w11 tncr) s,rr�tL�tce �r Zol6s�lcc>7-4�1v_H�__ <br /> b. Tank/Piping Hauler- �1 <br /> Name P <br /> Address Chy Zip <br /> Phone No.( <br /> Hauler Haglsnathm P Of hauled as bazardops) _ - <br /> C. Tankfthia Disposal Site: Aj ' <br /> Name <br /> Address City EP <br /> Phone No.( <br /> RPAM#(If transported to a permitted TSD facIllry) <br /> 9. is the sampling firm an Independent third party from the contractor? YRS(J NO(J •.JA K <br /> 9a. Describe,Id detaIX how the soli and/or water sample(s)beneath the tank and piping will be obtained: <br /> C S,Vfr P!,GQ,n1 aew-, D�14e-j ' z2zV31 <br /> i <br /> 10. Describe how the excavation will be backfUled with suitable material upon remover <br /> A.)l R <br /> it. Handling of excavated so1L <br /> a)What material will be used to Dne the tank pit and cover the slocolle? <br /> �)I►t I <br /> --- <br /> b) <br /> -b)What will.be the final destinadou of the excavated storkpue? <br /> NIr} <br /> c)Contaminated 8oH Hazardous Waste Hauler. <br /> Name 't)IR Hauler Heest mUm 0 <br /> Address City 21p <br /> Phone Ne.(-- ) <br /> HH 23 046(Revised 0&13199) Page 5 <br /> 12/10/02 TILE 09:43 tTX/RX NO 87091 (M009 <br />