Laserfiche WebLink
1%r 1.00 <br /> Mr. Dennis Catanyag <br /> November 27, 2002 <br /> Page 2 <br /> Prior to performing field activities, the San Joaquin County Environmental Health will be <br /> notified at least 48 hours in advance to witness temporary closure activities. <br /> Every three months, a visual inspection will be performed in order to document the tanks are still <br /> out of operation, locks are still in place, and no fuels have been added. Atmospheric readings <br /> will then be measured inside the USTs to ensure the LEL and oxygen concentrations remain <br /> below 10%. A copy of the monitoring form is included in Attachment 4. <br /> If you have any questions or comments,please do not hesitate to contact me at (925)288-2103. <br /> Sincerely, <br /> Shi <br /> w Environmental, Inc. <br /> b Delna� <br /> Technical Task Manager <br /> cc; Mr. Andrew Taylor, SBC Pacific Bell <br /> Attachments: <br /> Attachment 1 —Permit Application <br /> Attachment 2— State of California Forms <br /> Attachment 3 -Health and Safety Plan <br /> Attachment 4 - Quarterly Monitoring Form <br />