My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2002 TEMP CLOSURE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2300
>
2300 - Underground Storage Tank Program
>
PR0231893
>
REMOVAL_2002 TEMP CLOSURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:35 PM
Creation date
11/4/2018 2:16:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2002 TEMP CLOSURE
RECORD_ID
PR0231893
PE
2361
FACILITY_ID
FA0018028
FACILITY_NAME
AT&T CALIFORNIA - UE17L
STREET_NUMBER
2300
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
Stockton
Zip
95210
APN
12002013
CURRENT_STATUS
02
SITE_LOCATION
2300 E EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\2300\PR0231893\TEMP CLOSURE 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. a Describe the method that will be utilhed to purge andlor inert the tank(s): <br /> T>a�r ,li 1•r „vu�rc� wl dati lu a �Joas ],coogallaP1S <br /> b. Tank/Piping Hauler. <br /> Y <br /> Name <br /> Address City Zip <br /> Phone No.( ) <br /> Hauler Registration X Of hauled as hazardous) <br /> C. Tankftlug Disposal Site: <br /> Name <br /> Address CityZip <br /> Phone No.( ) <br /> EPA IDX Of transported to a permltte d TSD facility) <br /> 9. Is the sampling firm an Independent third party from the contractor? YES[J N0[I <br /> 9a. Describe,In detall,how the soil andlor water sample(s)beneath the tank and piping will be obtained: <br /> A)I V�Y' <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> 1t. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? <br /> C)Contaminated Soil Hazardous Waste Halder. <br /> Name Hauler Registration X <br /> Address City ZIP <br /> Phone No. <br /> EH 23 096(Revised 08113199) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.