Laserfiche WebLink
WRITTEiti- MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PRbd M <br /> This monitoring program must be bmt at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division.phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, uni=required to obtain approval before making the change. <br /> R&Tdred by Sections 2632(d) and 2641(h) CCR <br /> Facility Name KING IS L A 0 R ESOR <br /> Facility Address 11536 WEST EII T WERE RbAb STbC CTN CA q 5Z11 <br /> A. Describe the freque=7 of performing the monitoring: <br /> Tank DRILY AND MOUTH REPORTS P(36VIDEb 13J USTMAM <br /> 1N )u- IVIES -TuC . <br /> Piping AWNUAL LINETESTS PERFORMED BY AFFORD- A- TEST <br /> B. What methods and --Vuipment, identified by name and model, will be used for <br /> performing the mo - ' g: <br /> Tank PETROMET R aulD LEVELSMID1LA11C SISTEM MODCL 1329 TYPE <br /> J14A (DIESEL) MODEL 1329 ?YPE Z21A ( 6AS) MFG M PETROMIETE2 CARP, <br /> Piping EXTENDED LIFE LEAK DElECTbRS. MODEL -LL-t)3[.-XL- r) <br /> L DSAPNRArA 1WE MFG SY RED JACKET I A MARLEY CbMP. <br /> C. Describe the locaticgs) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> FETRMETER. LOCATED -IN) MAwTENPtnuE SHDP NEi(T To 'ME <br /> KIML 15LAt4b STME. <br /> D. List the name(s) and fzle(s) of the people responsible for performing the monitoring <br /> and/or maintaining :Le equipment: <br /> SERGt`I LL)ALk : HARBOR MASTS <br /> "UbUG E.LSLbQZTN : ASSISTA07 4�ARBnk MA-sT= <br /> SAM) HILLIKEk : MARINA ECN M11C- <br /> E. Reporting format 51 monitoring: <br /> Tank AMNTNL`1 REPDRT PRbVIDED 8`1 USTMAKI . <br /> Piping ANNUAL TEST PEQF6RME1 Li`l AFFORD-A -TEST. <br /> F. Describe the preve..-+e maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> butnotlessthaneve.-vLmonths: AMNUAL Lk AS NEEDED. <br /> G. Describe the traini-_ necessary for the operation of UST system, including piping, <br /> and the monitoring--uipment: HAR88k MASTER TRAIMIS ALL NEW <br /> PERSONNEL AMb ENSU WEv MEET AND MAt-PJTAT-M <br /> ACCEPTABLE GUIDELIOLS AND STAMIDARD . <br />