Laserfiche WebLink
CONTAINMENT Monitoring Fluid Fill Kit <br /> SOLUTIONS (KIT-MFFK) <br /> The Containment Solutions' Monitoring Fluid Fill Kit t <br /> (Model MFFK)must be used when filling the monitoring <br /> space of a CSI double-wall tank sump. Follow allAlways wear safety glasses and protective clothing when <br /> Double-Wall Tank Sump Installation Instructions handling brine or propylene glycol solution. <br /> (Pub. No. INST 6034) prior to filling. <br /> Monitoring Fluid Fill Kit(Model Kit-MFFK)Contents: Fill the sump in the following order: <br /> " (1) 1%' PVC threaded fill fitting with 2 short hoses 1. Prepare the required gallons of monitoring fluid for <br /> and barbed hose connectors. each tank sump. <br /> " (1)siphon gun. Tank Sump Gallons Monitoring Fluid Required <br /> " (1)8' long'/a' OD by%o ID plastic tubing. Total Height 42" 48" <br /> " (1)4' long%"OD by%" ID plastic tubing. Round or Polygon Round or Polygon <br /> 4' 9 10 <br /> FIGURE A 5' 10 11 <br /> 6' 11 13 <br /> + 7' L 12 14 <br /> 2. Press and hold the siphon gun trigger to begin <br /> fluid filling. <br /> 3. As the fluid level drops in the bucket, add fluid as <br /> needed to keep fluid level above the hose end. <br /> To siphon gunfTo monitoring fluid 4. When the monitoring fluid reaches the reservoir, <br /> (connect 4'tube) onnect 8'tube) release the siphon gun trigger. <br /> 5. When the vacuum is stopped, the fluid level in <br /> PVC Fill Fitting the reservoir will drop as the sump walls stabilize. <br /> Manually top off reservoir with monitoring fluid as <br /> indicated on sump label. <br /> 6. Wait until the fluid level in the sump stops <br /> changing (24 hours is recommended)and then top <br /> off the reservoir. The desired final monitoring fluid <br /> Perform the preparation in the following order: level is indicated on the side of the reservoir. <br /> 1. Remove the permanent 1'/"reservoir plug from 7. Remove the PVC fill fitting, insert the single point <br /> sump reservoir and set aside for later use. float sensor and re-install the 1'/"permanent <br /> 2. Install and hand tighten the 1'/2" PVC fill fitting into reservoir plug. Be sure the reservoir plug has at <br /> the sump reservoir coupling. No thread dope or least a''/a"diameter hole in the top of the plug or <br /> Teflon tape is required (see Figure A). around the wire for venting of the reservoir. Do not <br /> 3. Connect the 8' plastic tubing to the monitoring caulk or otherwise seal the vent space between <br /> fluid tubing barb and place the opposite end of the the wire and the fitting hole. <br /> tubing in a bucket of monitoring fluid.Temporarily <br /> attach the tubing to the bucket to keep the end <br /> positioned at the bottom of the bucket. <br /> 4. Connect the 4' plastic tubing to the siphon tubing <br /> barb and connect the opposite end to the siphon <br /> connection on the siphon gun. Field Service Dept. Technical Support <br /> 5. Connect the siphon gun to an air compressor. Mt. Union, Pennsylvania Conroe,Texas <br /> Regulate the supplied air pressure to not exceed (800)822-1997 (800)537-4730 <br /> 100 psi. Typical air consumption is 13.7 scfm at (814)542-8520 (936)756-7731 <br /> 100 psi. <br /> copyright®2009 Containment solutions,Inc.•All Rights Reserved•Oclober 2009•Pub.No.INST 5049 <br /> 7 <br />