My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 10:45:22 AM
Creation date
11/4/2018 2:28:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\BILLING 2013 - 2014.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BCE#12919 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- age l of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> lbeck one item only) N 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(Sl LT 4-LUBRIZOL <br /> I. FACILITY INFORMATION <br /> FACILITY Ill#(Agency Use 0nly) <br /> BUSINESS NAME(Same as FACILD'Y NAME) Costco Gasoline(LOC.N0.1031) 3. <br /> BUSINESS SPTH ADDRESS tp3, <br /> 2440 Daniels Sheet CTl'Y Manlsea <br /> YI.EQUIPMENT TESTING AND:I'REVENTIVE MAINTENANCE' <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak deleclors,etc.)must be performed at the loquency <br /> specified by the equipment manufacturers'ins Wctiona,or annually,whichever is more trequcnq and that such work must be performed by qualified personnel. <br /> 27 CCR�2632,2634,2635,-2641L_-_ <br /> MONITORING EQU[PMF.NT IS SERVICED ® I.ANNUALLY ❑ 99.OTHER(Specif)•): 490'3• <br /> 490.36 ' <br /> IILMNI�'ORIGLOCATiONS <br /> 1.NEW ON <br /> SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PR <br /> 2634)49a4 EVIOUSLY SUBMITTED. (23 CCR§2632, <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ■ LCONTINUOUSELECTRONIC TANK MONITORING OF ANNULAR ttril 5I UIIAL)SPACE(S)OR SECONDARY--CONTAINMENT-49o5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a DRY © b.LIQUID FILLED ❑ c.PRESSURIZED [I d.TINDER VACUUM 4� <br /> PANEL MANUFACTURER: Veedx-Root atiai: _.__._ <br /> -- MODEL#: TLS350R 49LL5 <br /> LEAK SENSOR MANUFACTURER: Veedar-Root ^� 490-9. MODEL#(S 79 794330-303 <br /> 2,AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL IANKISI (23 CCR§ 43) 490-11 <br /> _ PANELMANUFACTURER: 490-12. MODEL#: 490-1 <br /> _1N-T6I4K PROBE MANUFACTURER: 490.14' MODEL#iS): __ _ 4W15LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DA[LY/NIGHTLY ❑ c.WEEKLY _ 490-16 <br /> �_ ❑ d MONTHLY El M OTHER JSpocifyj; 490-17 <br /> PROGRAMMED TESTS: ❑ a0.1 gp.h. ❑ b.01 g.p.b. ❑ c.OTHER(Specify): +90.13 <br /> 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.19490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> S.TANK INTEGRITY TESTING(23 CCR§2643.1): 490¢2 <br /> TEST FREQUENCY: ❑ a ANNUALLY 490-23 <br /> ❑ b.BIENNIALLY ❑ C.OTHER(Specify): 490.23 <br /> 490-25 <br /> ❑99.OTHER(Specify): <br /> 190.26 <br /> i,V.PIPE MONITORING IS PERFORMED WING THE FOLLOWING METHODS (Check ell that apply) <br /> 1.CONTINUOUS MONITORING OF PIPEJ PIPING SUMPS)AND OTHER SECONDARY <br /> VISUAL ALARMS. (23 CCR§2636) CONTAINMENT WITH AUDIBLE AND 490-20- <br /> SECONDARY CONTAINMENT IS:❑a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ®d UNDER VACUUM 490a9 <br /> PANEL MANUFACTURER: Veeder-Root #; TL535oR � +90--31 <br /> LEAK SENSOR MANUFACTURER_Veeder-Root _ 490.32 MODEL S: 794330-323.794390304,85728(1-tOp +900-3 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. _----1.----�-� '---' <br /> ®a.YES ❑b.NO 49x34 <br /> .MECHANICAL <br /> LINE TONLEA OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. N a.YES ❑b.NO 490.35 <br /> ■ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT PLOW WHEN A LEAK IS DETECTED(23 CCR 2636 __ _ <br /> ____ ____ 490--36 <br /> MLLD MANUFACTURER(S): PE Petro 49o-n MODEL#(S): STP-MLDA � � wo-3s <br /> ❑ 3_ELRCTRONIC LINR LEAK DETECTOR(ELLD)THAT ROUTRV_ELY PERFORM_33.O g.p.h.ISAR TESTS (Z3 CCR§2636) 4yp-3y <br /> _ __.___ <br /> ELLD MANUFACTURERS) DO"+_°7 :- __ 490+1 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ I.MINIMUM MONTHLY 0.2 g.p.h. [12.MINIMUM ANNUAL 0.1 --_-T.. -_.--+- <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. g p h 490.43 <br /> ❑a.YES ❑b.NO <br /> ELLD FAILNTE R ITY T ONN G ION49o4s TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490'N <br /> 4.PIPE INTEGRITY TESTING 49o4s <br /> TEST FRE UENCY ❑ a ANNUALLY b.EVERY 3 YEARS c.OTHER 5 ci <br /> S.VISUAL PIPE MONITORING. 49046 49047 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&pACH TIME SYSTEM OPERATED. 49048 <br /> •AB.o dfam0vi ofu-1-diner c eneremr Nal 'in adX W HSC IMR15 3 49049 <br /> ❑ 6.SIICTTON PIPING MEETS EXEMPTION CRITERIA[23 CCR§26361 .. <br /> 49041 7•NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM 490-50 <br /> ❑ <br /> 99.OTHER(Specify) <br /> 490.51 <br /> 190-53 <br /> UPCF UST-D(12/2007)I/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.