My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
COMPLIANCE INFO_2013 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 2:07:49 PM
Creation date
11/4/2018 2:28:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2016
RECORD_ID
PR0527629
PE
2351
FACILITY_ID
FA0018721
FACILITY_NAME
Costco Wholesale #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
2440 DANIELS ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DANIELS\2440\PR0527629\COMPLIANCE INFO 2013 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
461
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />Important! All operating, setup and historical data will be lost when the console is turned off and the <br />ECPU board is replaced. <br />1. Perform the "Archiving the System Setup Into the EEPROM Chip" on page 4. <br />2. Switch Off power to the Console. Open the left front door of the console, Follow the steps in Figure 1 to <br />�f <br />remove the ECPU board. <br />8. Place old and new ECPU boards side by side on a clean work surface. Make sure that the Battery Backup <br />switches on both boards are turned Off. <br />4. Using a chip removal tool similar to the one shown (1C Extraction tool, Digikey Part No. K158 -ND, or <br />equivalent), follow the steps outlined in Figure 4 remove the E2 chip from the old ECPU board and install it the <br />identical socket on the new board reversing the procedure shown in Figure 4. Observe chip orientation as <br />shown in Figure 5. <br />5. Remove the SEM module from the old board and install it in the SEM socket of the new board (ref Figure 10 <br />on page 17), ,Note: Either type SEM will only plug in one way. <br />6. Remove the software module from the old ECPU board and install it on the new board (ref Figure 8 on <br />page 14). If present, also remove the memory module from the old ECPU board and install it on the new <br />board. <br />1. .•..111— tj tiro r— ru ®oara <br />
The URL can be used to link to this page
Your browser does not support the video tag.